How to pass signals between barge and crane on bridge work
How bridge construction crews pass signals between barge and crane, with what to ready, steps, tool options and common mistakes to avoid.
2Dig is published by the makers of OperatorLink, which is compared here alongside other tools.
A barge and crane crew needs one agreed set of signals, one signal person who can see the load, and a backup channel in case the main one drops. OperatorLink is one option: it shows STOP, HOLD and SLOW on crew phones in a browser. [1] Button presses, chat and voice pass between phones in a browser. [1] Check the signal on the barge and the crane before relying on it.
| Option | What it does | Fee | Card fee |
|---|---|---|---|
| OperatorLink | Shows STOP, HOLD and SLOW to the crew and passes button presses, chat and voice between phones in a phone browser [1] | Currently free to use, and no paid plan is built yet [1] | not published |
| Two-way radio | not published | not published | not published |
| Phone video call app | not published | not published | not published |
| Hand signals from a signal person | not published | not published | not published |
What you need before you start
Bridge crews working between a barge and a crane need a clear plan for who gives the signals, what each signal means, and who can see the load from where they stand. Agree on the signal person before the lift starts, and make sure that person can see both the crane operator and the load. Write the signals down in plain words so the barge crew and the crane crew use the same meanings. Choose a backup channel, such as a radio or hand signals, in case the main one drops.
Button presses, chat and voice pass between phones in a browser. [1] The person who starts the session shares a link or QR code, and the rest of the crew joins from it. [1] A jobsite link stops working 12 hours after the first person joins it. [1] A session with nobody in it is wiped after 3 idle hours, so start it close to the lift. [1] Decide in advance which signal stays on screen, since HOLD and SLOW stay on for everyone until the last person leaves. [1]
Step by step
- Name the signal person and a backup person before the lift starts, and agree in writing what STOP, HOLD and SLOW mean for this job.
- Check that every phone can open a browser, because button presses, chat and voice pass between phones in a browser. [1]
- Have the person who starts the session open it from a phone browser. No app install is needed. [1]
- That person shares the link or QR code, and each crew member joins from it. [1]
- Confirm that everyone is in the session and can see the signal screen before any load moves. [1]
- Use STOP for any unsafe move. It releases every held direction on every phone and shows a full-screen alert to everyone else. [1]
- Use HOLD and SLOW as the lift needs them. They stay on for everyone until the last person leaves the jobsite. [1]
- Keep a move button pressed only while that move is needed. A held move keeps going to the other phones, and if it stops arriving for 2 seconds, they drop it, so watch for that. [1]
- For short calls, use one-tap messages such as Go Ahead, Copy That and All Clear, which are sent as chat messages. [1]
- Check the alert on each phone. On Android browsers, signals such as STOP make the phone buzz, while iPhone Safari ignores the buzz. [1]
- When the lift is done, everyone leaves the session. A session with nobody in it is wiped after 3 idle hours. [1]
Tools that can do it
OperatorLink is made by the team that publishes this site. It shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser. [1] Anyone who joins can take part in a voice call run from the phone browser. [1] Nobody needs to install an app to use it. [1] It is currently free to use, and no paid plan is built yet. [1] A phone's home screen can hold it as a standalone app. [1] Button presses, chat and voice pass between phones in a browser. [1]
A two-way radio is a second option. No facts here describe one, so check that the crew agrees on plain voice, that every member can be heard over the noise of the lift, and that the channel stays clear through the whole lift.
A phone video call app is a third option. No facts here describe one, so check whether the call can stay open for the whole lift, whether the signal person stays in view, and whether the phone locks its screen during the lift.
Hand signals from a signal person are a fourth option. No facts here describe one, so check whether the barge crew and the crane operator can both see the signal person for the whole lift.
Match the option to the crew and the site, and keep a fallback ready.
Common mistakes to avoid
Relying on one channel for the STOP signal. If one phone or one radio drops out, the crew needs a backup, so keep hand signals or a radio ready.
Assuming every phone alerts the same way. On Android browsers, signals such as STOP make the phone buzz, while iPhone Safari ignores the buzz, so check the sound and screen on every phone. [1]
Starting a session the day before and expecting it to be ready. A session with nobody in it is wiped after 3 idle hours. [1]
Reusing an old link. A jobsite link stops working 12 hours after the first person joins it. [1]
Forgetting that HOLD and SLOW stay on for everyone until the last person leaves, so the signal stays on until the whole crew has left the jobsite. [1]
Assuming a move still arrives. If a held move stops arriving for 2 seconds, the other phones drop it. [1]
Frequently asked questions
Is OperatorLink free to use?
OperatorLink is currently free to use, and no paid plan is built yet. [1] Button presses, chat and voice pass between phones in a browser. [1] Check the signal on the barge and the crane before relying on it, and keep a backup channel ready for the job.
What happens when OperatorLink's STOP signal is pressed?
STOP releases every held direction on every phone in the session and shows a full-screen alert to everyone else. [1] HOLD and SLOW work differently: they stay on for everyone until the last person leaves the jobsite. [1] Agree in advance who presses STOP and what the crane operator does when it appears.
How long does an OperatorLink jobsite link stay active?
A jobsite link stops working 12 hours after the first person joins it. [1] A jobsite with nobody in it is wiped after 3 idle hours. [1] For a new shift, the person who starts the jobsite should open a fresh session and share the new link or QR code with the crew before the lift begins.
Do OperatorLink signals buzz on every phone?
On Android browsers, signals such as STOP make the phone buzz. [1] iPhone Safari ignores the buzz. [1] On an iPhone, the crew relies on the full-screen alert that STOP shows. [1] Check the sound and screen settings on every phone before the lift so nobody misses a signal.
Can OperatorLink carry voice calls during a barge lift?
Anyone who joins the jobsite can take part in a voice call run from the phone browser. [1] One-tap calls such as Go Ahead, Copy That and All Clear are sent as chat messages. [1] Voice and chat both pass between phones in a browser, so keep a radio or hand signals ready as a backup. [1]
OperatorLink is currently free to use, and no paid plan is built yet. [1]
Try OperatorLinkSources
Related comparisons
- How to assess crane signal trainees passing calls clearly
- How to assign crane crews to jobs for crane dispatchers in 2026
- How to assign who gives signals during a pick for lift planners
- How MEWP crews call a stop near overhead hazards
- Calling material lifts to upper decks for scaffolding crews
- How to call hold during tight lifts for plant riggers
- How to call hold when a hose shifts under pressure
- Call hold when a load goes out of level
- Call HOLD when a load nears live process equipment
- How to call hold when a load shifts during a lift