2Dig Plain comparisons of crane signalling and jobsite communication tools

How to oversee lift days on a busy site for crane superintendents

Steps, tools and common mistakes for crane site superintendents overseeing lift days on a busy site, with the crew's signals and stop calls.

By 2Dig ยท

2Dig is published by the makers of OperatorLink, which is compared here alongside other tools.

Overseeing lift days on a busy site comes down to a clear plan for who signals, who can call a stop, and how every crew member gets the same message. Settle those roles before the first pick, test the signal at the lift point, and keep a backup method ready.

OptionWhat it doesFeeCard fee
OperatorLinkShows STOP, HOLD and SLOW to the crew and passes button presses, chat and voice between phones in a phone browser [1]Currently free to use, no paid plan built yet [1]not published
Phone video call appnot publishednot publishednot published
Two-way radionot publishednot publishednot published

What you need before you start

Before the first pick, the superintendent should have the lift plan in hand and a named person for each role. Name the signal person, who relays the crane operator's commands and directions, the people allowed to call a stop, and anyone who must stay out of the load path. Write those names where the whole crew can read them.

Confirm the crane operator can see the signal person, or that a second line of contact works if sight lines are blocked. Test the signal method at the actual lift point rather than at the trailer, because a dead spot near the load is a common reason a message goes missing. Agree on one stop call that anyone on the ground may use, and make sure every person knows the exact words.

Confirm the load weight, the rigging and the swing path with the lift engineer before work starts. Brief the crew at the start of the shift, and repeat the brief after any break in the work or change in the crew. Keep a backup method ready, since phones and radios both depend on signal and battery power.

If the crew chooses a phone session, the session passes button presses, chat and voice between phones in a phone browser. [1] The person who starts a jobsite shares a link or QR code, and the crew joins from it. [1]

Step by step

A lift day runs best when one plan sets the order of work and everyone on the ground knows their part. The steps below are tool-neutral, so they apply whether the crew uses radios, hand signals or a phone session.

  1. Hold a short pre-lift meeting with the crane operator, signal person, rigger and everyone working near the load, and go through the lift plan line by line.
  2. Confirm every role is named, and that each person can state their role without looking at the list.
  3. Walk the swing path and the set-down area, and move anyone out of the zone who does not need to be inside it.
  4. Test the signal method from the lift point, confirming the operator receives a message and the signal person can see the load.
  5. Agree on the stop call and the order of the commands before the first pick, and make sure every person uses the same words.
  6. Start the lift only when every role is filled and the operator confirms readiness.
  7. Send one command at a time, and have the signal person repeat each command back to the operator when the operator cannot see the load.
  8. When anyone sees a problem, call stop at once, and do not resume until the superintendent or the designated lead says the area is clear.
  9. Re-check the load path and the crew after any change in wind, any pause in the work, or any new person entering the zone.
  10. At the end of the shift, confirm the load is set down and secured, and close the session or radio channel if one was used.

Keep a written record of the plan, the names and the stop calls, so the next shift starts from the same facts.

Tools that can do it

OperatorLink is made by the team that publishes this site. It shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones. [1] [1] One person starts the jobsite and shares a link or QR code, and the crew joins from it. [1] Holding a move button keeps sending that move to the other phones, and if it stops arriving for 2 seconds, the other phones drop it. [1]

A phone video call app is a second option. For a phone video call, check whether the call can stay open for the whole shift, whether the signal person stays in view of the operator, and whether the phone's screen stays on during the lift.

A two-way radio is a third option. For a two-way radio, check that every crew member can hear calls over machine noise, that the crew uses plain wording, and that the channel stays clear through the lift.

Match the option to the site and the crew, and keep a fallback ready for when a phone loses its signal.

Common mistakes to avoid

Relying on one signal path for the stop call is the most serious mistake, because a single dropped line can leave the crew with no way to halt the lift. Keep a second way to call stop ready, even if it is a hand signal from the signal person.

Assuming every crew member heard a command is another common error, so have each person repeat it back. Restating the plan only at the start of the day also causes trouble, since the crew drifts from it over a long shift. Restate it after breaks and crew changes.

Skipping the signal test at the lift point is a costly mistake, because a message can work at the trailer and fail near the load. Changing the stop call from shift to shift confuses people under pressure, so keep the same words every day.

Finally, leaving phone sound and screen settings unchecked can mean a missed alert. On Android browsers, the STOP signal makes the phone buzz, while iPhone Safari ignores the buzz, so check sound and screen on every phone before the lift. [1]

Frequently asked questions

Is OperatorLink free to use?

OperatorLink is currently free to use, and no paid plan is built yet. [1] Before a shift, check that each phone can open a browser and has a working data signal. Ask the superintendent which phones will join the session, and confirm the crew agrees on the stop call before the lift begins.

What does the STOP signal do in OperatorLink?

STOP releases every held direction on every phone and shows a full-screen alert to everyone else. [1] HOLD and SLOW work differently, because they stay on for everyone in the jobsite until the last person leaves. [1] The superintendent should agree on the stop call before the first pick, and practice it so the crew can use it quickly under pressure.

How long does an OperatorLink jobsite link stay active?

A jobsite link stops working 12 hours after the first person joins it. [1] A jobsite with nobody in it is wiped after 3 idle hours. [1] For each new shift, start a fresh session and share the new link or QR code, so the crew does not rely on an old one. Check the link at the start of every shift before the first pick.

Does OperatorLink make phones buzz for alerts?

On Android browsers, signals such as STOP make the phone buzz, while iPhone Safari ignores the buzz. [1] STOP shows a full-screen alert to everyone else, so the crew should watch the screen as well as listen. [1] Test each phone with the crew before work starts, so no one discovers a missing alert during the lift.

Can OperatorLink carry voice calls during a lift?

Anyone who joins the jobsite can take part in a voice call run from the phone browser. [1] One-tap radio-style calls such as Go Ahead, Copy That and All Clear are sent as chat messages. [1] Keep a radio or hand signal ready as a fallback, since a phone session is one option among several and the crew should agree on which one leads.

OperatorLink is currently free to use, and no paid plan is built yet. [1]

Try OperatorLink

Sources

  1. OperatorLink's own description of itself (the product of this site's publisher)

Related comparisons