2Dig Plain comparisons of crane signalling and jobsite communication tools

How to keep voice contact across a loud site for sheet pile installers

How sheet pile installers can keep voice contact on a loud site, with what to have ready, the steps, tool options and common mistakes to avoid.

By 2Dig ยท

2Dig is published by the makers of OperatorLink, which is compared here alongside other tools.

Voice contact on a loud site depends on agreeing on fixed phrases and a fallback before the shift, getting every crew member onto the same channel, and checking that each person can hear and be heard over machine noise at the pile location.

OptionWhat it doesFeeCard fee
OperatorLinkShows STOP, HOLD and SLOW to the crew and passes taps, chat and voice between phones over a web page [1]Currently free to use, and no paid plan is built yet [1]not published
Phone video call appnot publishednot publishednot published
Two-way radionot publishednot publishednot published

What you need before you start

Sheet pile installers working a loud site need a plan for talking that does not depend on shouting over the hammer. Before the shift, agree on who gives signals, which short phrases mean what, and what the crew does if the call drops. Each person needs a phone or radio charged for the whole shift, with the volume turned up and a way to hear it over the machine noise.

Pick one person to start the call and share its join link or code with the crew, so nobody is left guessing which channel is live. Check that the phones have a working data signal at the actual pile location, since a spot that is quiet on the way in may not hold a signal once the rig is running. Keep a list of hand signals posted where everyone can see it, and make sure the crew knows the fallback before the first pile is driven. Decide who watches for a stop call and who repeats it, so the message reaches the rig operator without delay.

Step by step

  1. Walk the site before the shift and note the loudest spots, such as the hammer position, the generator and the truck route, because voice carries least there.
  2. Agree on a short set of fixed phrases for stop, hold, slow, go ahead, copy that and all clear, and have every person say each one out loud at least once.
  3. Pick a fallback signal such as hand signals or a whistle, and confirm that every crew member knows what it means and who gives it.
  4. Start the call from one phone or radio and share the join link or code with the crew, so everyone is on the same channel.
  5. Have each person speak a test phrase while the hammer runs, and confirm the rest of the crew can hear it over the machine noise.
  6. Place the signal person where the rig operator can see them clearly and where they can also see the hammer operator.
  7. Repeat each critical call back to the sender before moving the load, so the message is confirmed before anyone acts on it.
  8. Check the call again after any break in the shift, and again after a move to a new pile location.
  9. At the end of the shift, have everyone leave the call and note any spots where voice did not carry, so the next shift can plan around them.

Tools that can do it

OperatorLink is made by the team that publishes this site. It shows STOP, HOLD and SLOW to the jobsite crew and passes taps, chat and voice between phones over a web page, with no app to install. [1] [1] Nobody needs to install an app, because it works on the phone with no app to install. [1] The person who starts a jobsite shares a link or QR code, and the crew joins from it. [1] Anyone who joins can take part in a voice call on the phone. [1] One-tap calls such as Go Ahead, Copy That and All Clear are sent as chat messages. [1] The page can also be added to a phone's home screen. [1]

A phone video call app is a second option. No facts here describe one, so check whether the call stays open for the whole shift, whether the signal person can be seen by the rig operator while the call runs, and whether the phone's screen stays on during a lift.

A two-way radio is a third option. No facts here describe one, so check that the crew agrees on plain voice, that every member can be heard over machine noise, and that the channel stays clear through the lift.

Match the option to the crew and the site, and keep a fallback ready for any option that depends on a phone's connection.

Common mistakes to avoid

Relying on voice alone in the loudest part of the site. Machine noise can cover a voice, so agree on a hand signal or a whistle as the fallback. Skipping the test call before the first lift, so nobody knows whether the phones can be heard over the rig. Letting a call go quiet and assuming the crew still hears it; repeat a test phrase after any break in the shift. Using vague words such as 'hold on' for different things; pick fixed phrases and say each one the same way every time. Expecting one signal person to see everything; place a second watcher where the view is clear.

On Android browsers, signals such as STOP make the phone buzz, while iPhone Safari ignores the buzz, so check the sound and screen on every device. [1] Forgetting that HOLD and SLOW stay on for everyone until the last person leaves. [1] Leaving an empty session and expecting it to hold the next day, when a jobsite with nobody in it is wiped after 3 idle hours. [1]

Frequently asked questions

Is OperatorLink free to use on a sheet pile site?

OperatorLink is currently free to use, and no paid plan is built yet. [1] Because it runs in a phone browser with no app install, the crew only needs a phone with a working data signal and the link or QR code the session host shares. [1] Test the session on the site before relying on it for a shift, so the crew knows how it behaves at the actual pile location.

Does OperatorLink let crew members talk on a voice call?

Anyone who joins the session can take part in a voice call on the phone. [1] One-tap calls such as Go Ahead, Copy That and All Clear are sent as chat messages. [1] Agree on which phrase means what before the shift, and keep a hand signal or whistle as a fallback for the loudest spots on the site.

How long does an OperatorLink jobsite link stay active?

A jobsite link stops working 12 hours after the first person joins it. [1] A jobsite with nobody in it is wiped after 3 idle hours. [1] For each shift, have the person who starts the session share a fresh link or QR code with the crew, rather than reusing one from an earlier day.

Do OperatorLink STOP signals buzz every phone?

On Android browsers, signals such as STOP make the phone buzz. [1] iPhone Safari ignores the buzz, so an iPhone user has to rely on the full-screen alert that STOP shows to everyone else. [1] [1] Check the sound and screen settings on every phone before the lift, and keep a hand signal ready for anyone who cannot see the screen clearly.

What should a sheet pile crew check before relying on voice contact?

Check that every crew member can hear and be heard at the actual pile location while the hammer runs, not only in the yard. Test the fixed phrases such as stop, hold and slow, and confirm each person knows what they mean. Agree on a fallback such as hand signals or a whistle, and confirm the signal person can be seen from the rig. Repeat the check after any break in the shift.

OperatorLink is currently free to use, and no paid plan is built yet. [1]

Try OperatorLink

Sources

  1. OperatorLink's own description of itself (the product of this site's publisher)

Related comparisons