Guide wall panels upright with the crane operator
How tilt-up crews guide wall panels upright with the crane operator, with what to have ready, the steps and common mistakes.
2Dig is published by the makers of OperatorLink, which is compared here alongside other tools.
To guide a wall panel upright with the crane operator, the tilt-up crew keeps the operator informed of the panel's position and the next move through one shared channel, with a clear STOP signal ready at all times. Each crew member joins one jobsite session from a phone browser, using a link or QR code that someone shares. STOP brings up a full-screen alert to everyone else, and HOLD and SLOW stay on for the whole jobsite until the last person leaves. [1] [1] A jobsite with nobody in it is cleared after 3 idle hours. [1]
| Option | What it does | Fee | Card fee |
|---|---|---|---|
| OperatorLink | Puts STOP, HOLD and SLOW in front of the crew, and carries button presses, chat and voice between phones in a browser [1] | Free to use at present; no paid plan is built [1] | not published |
| Phone video call app | not published | not published | not published |
| Two-way radio | not published | not published | not published |
What you need before you start
Each member of the tilt-up crew needs a phone with a working browser, since button presses reach the other phones through that browser. [1] Check the signal on each phone at the site before the lift starts. One person opens the jobsite and passes along a link or QR code, and the other crew members use it to get in. [1] Agree before the lift on how HOLD and SLOW will be used, because they remain on for everyone until the final person leaves. [1] Phones can also hold the page on their home screen, where it opens as a standalone app. [1] Agree on who calls the panel's position to the operator and who calls the next move, so the operator hears one voice at a time.
Step by step
- Confirm each phone's browser opens, since presses and chat pass between phones in the browser. [1] Check the signal on each phone at the site before the lift starts.
- The person opening the session does it in a phone browser, so there is nothing to install. [1]
- Send the link or QR code to the crew, and each member uses it to join. [1]
- Note that HOLD and SLOW stay active for the whole jobsite and clear only once the last person has left, so plan for that. [1]
- Holding a move button keeps sending that move to the other phones; if it stops arriving for 2 seconds, they drop it. [1]
- STOP releases every held direction on every phone and shows a full-screen alert to everyone else. [1]
- One-tap radio-style calls such as Go Ahead, Copy That and All Clear are sent as chat messages. [1]
- A jobsite with nobody in it is wiped after 3 idle hours. [1]
Tools that can do it
OperatorLink is made by the team that publishes this site. It puts STOP, HOLD and SLOW in front of the jobsite crew, and button presses, chat and voice move between phones through the browser. [1] [1] Nobody needs to install an app; the page runs in a browser. [1] Whoever starts a jobsite can pass along a link or QR code for the crew to use. [1]
A phone video call app is a second option. No facts here describe one, so check whether the crew can keep the call open for the whole lift, whether the panel's position stays in view, and whether the phone locks its screen mid-lift.
A two-way radio is a third option. No facts here describe one, so check that the crew agrees on plain voice, that every member can be heard over machine noise, and that the channel stays clear through the lift.
Match the option to the crew and the site, and decide what other communication method will be available if needed.
Common mistakes to avoid
Expecting every phone to alert the same way: Android browsers buzz on signals such as STOP, but iPhone Safari does not, so check the sound and screen on each device. [1] Reusing an empty session the next morning: a jobsite with nobody in it is cleared after 3 idle hours. [1] Missing that HOLD and SLOW persist for everyone until the final person leaves, which can leave a signal on longer than the crew expects. [1] Assuming a held move is still reaching the crew: after 2 seconds without arrival, the other phones drop that move. [1] Letting a phone's screen sleep during the lift; check each phone's screen settings before the panel is picked up. Calling the panel's position and the next move over each other, which leaves the operator unsure which call to act on. Keep one voice on the position and one on the next move, as the crew agrees before the lift.
Frequently asked questions
Is OperatorLink free to use?
There is no charge for OperatorLink at present, and no paid plan has been built yet. [1] OperatorLink passes button presses, chat and voice between phones in a browser. [1] Check each phone at the site before the lift.
What happens when the STOP button is pressed?
STOP releases every held direction on every phone and shows a full-screen alert to everyone else. [1] By contrast, HOLD and SLOW remain in place for the whole jobsite until the final person leaves. [1]
How long does a jobsite link stay active?
Links expire 12 hours after the first person joins, so an older link from a previous shift might not open the session anymore. [1] Separately, an empty jobsite gets cleared after 3 idle hours. [1] The person who starts a jobsite shares a link or QR code, and the crew joins from it. [1]
Do STOP signals buzz on every phone?
On Android browsers, signals such as STOP make the phone buzz. [1] iPhone Safari ignores the buzz. [1] Before the lift, check each phone's sound and screen setup.
Can crew members talk over the phone during a lift?
Anyone who joins the jobsite can take part in a voice call run from the phone browser, and one-tap radio-style calls such as Go Ahead, Copy That and All Clear are sent as chat messages. [1] [1] Decide what other communication method will be available if needed.
OperatorLink is currently free to use, and no paid plan is built yet. [1]
Try OperatorLinkSources
Related comparisons
- How to assess crane signal trainees passing calls clearly
- How to assign crane crews to jobs for crane dispatchers in 2026
- How to assign who gives signals during a pick for lift planners
- How MEWP crews call a stop near overhead hazards
- Calling material lifts to upper decks for scaffolding crews
- How to call hold during tight lifts for plant riggers
- How to call hold when a hose shifts under pressure
- Call hold when a load goes out of level
- Call HOLD when a load nears live process equipment
- How to call hold when a load shifts during a lift