How to Guide Tracker and Racking Lifts Across Open Fields
How to guide tracker and racking lifts across open solar fields, agree on signals, check phone communication, and compare tools for crane crews.
2Dig is published by the makers of OperatorLink, which is compared here alongside other tools.
To guide tracker and racking lifts across open fields, agree on clear signals, confirm who communicates with the crane operator, check the communication method on every phone or radio, and keep a backup ready. OperatorLink shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser. [1] It runs in a phone browser with no app install. [1]
| Option | What it does | Fee | Card fee |
|---|---|---|---|
| OperatorLink | Shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a browser. [1] | Currently free to use, and no paid plan is built yet. [1] | not published |
| Two-way radio | Details for a specific radio are not published. | not published | not published |
| Hand signals | Details for a specific hand-signal method are not published. | not published | not published |
| Phone voice-call app | Details for a specific phone voice-call app are not published. | not published | not published |
What you need before you start
Before guiding tracker or racking lifts across an open solar farm field, agree on who gives instructions, who operates the crane, and how the crew will communicate if the main method stops working. Keep the instructions short and use the same agreed meanings throughout the lift. Confirm that everyone understands when to stop, when to hold position, and when movement may continue.
Check the planned lifting area, the travel path, the position of the load, and the places where the crew can stand clear. Make sure the crane operator and signal person know how they will confirm a direction before movement begins. The communication method should be checked from the actual working positions, not just while everyone is standing together.
If using OperatorLink, each person joins the same jobsite session through a shared link or QR code. [1] The signals pass between phones in a browser, so check that each phone has a working data signal. [1] Agree on who will use STOP, HOLD and SLOW, and make sure the crew knows that HOLD and SLOW stay on for everyone until the last person leaves the jobsite. [1] Keep a voice, radio or hand-signal fallback ready in case the primary communication method becomes unavailable.
Step by step
- Agree on the communication lead. Identify the person who will direct the crane operator during the lift. Make sure the rest of the crew knows who is giving instructions and how to report a problem without creating conflicting directions.
- Review the lift and travel path. Confirm the load, the planned movement, the landing area and the positions of people working around the tracker or racking. Resolve any uncertainty before lifting begins.
- Choose the communication method. Use the method agreed for the job, such as hand signals, a two-way radio, a phone call or a shared phone-based signal session. Make sure the crane operator and the signal person can exchange and understand instructions from their working positions.
- Check the equipment and connection. For a phone-based method, check that the phones have a working browser and data signal. OperatorLink passes button presses, chat and voice between phones in a browser. [1] If the crew uses OperatorLink, the person starting the jobsite shares a link or QR code for the others to join. [1] Confirm that everyone who needs the signals has joined before the lift begins.
- Confirm the meaning of each signal. With OperatorLink, STOP releases every held direction on every phone and displays a full-screen alert to everyone else. [1] HOLD and SLOW stay on for everyone in the jobsite until the last person leaves. [1] Explain these differences before using the session to communicate during a lift.
- Check that movement instructions arrive. With OperatorLink, holding a move button keeps sending that move to the other phones. If the move stops arriving for 2 seconds, the other phones drop it. [1] Do not assume that a previously displayed movement instruction remains active if it stops arriving. Confirm the communication method is working before directing further movement.
- Use short, agreed instructions. Keep instructions focused on the next movement and confirm unclear messages before continuing. OperatorLink provides one-tap radio-style calls such as Go Ahead, Copy That and All Clear as chat messages. [1] Anyone who joins can also take part in a voice call through the phone browser. [1]
- Stop when communication becomes unclear. If a signal is missed, a direction is uncertain, or people are no longer sure what the crane operator has understood, use the agreed stop procedure. Re-establish clear communication before movement resumes. Do not rely on a phone display alone as proof that the operator has received and understood an instruction.
- Close out the session after the work. If OperatorLink was used, have everyone leave the jobsite session when finished. A jobsite with nobody in it is wiped after 3 idle hours, and its link stops working 12 hours after the first person joins. [1] [1] Start a fresh session for a later shift if needed.
Tools that can do it
OperatorLink is made by the team that publishes this site, 2Dig. It shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser. [1] The crew can join using a link or QR code, without installing an app. [1] OperatorLink is currently free to use, and no paid plan is built yet. [1] Button presses, chat and voice pass between phones in a browser. [1] Before relying on it during a lift, the crew should check that each phone's connection and alerts work by sending a test signal from the working position.
Two-way radios are another option to consider for communication between the signal person and crane operator. The available facts do not establish the range, sound quality, channel arrangements or other features of any particular radio. Check that the selected equipment works at the actual working positions, that instructions can be heard over site noise, and that the crew knows the agreed words and response procedure.
Hand signals are another communication method to consider where the signal person and crane operator can see each other clearly. Check that the planned positions, equipment and load do not block the view, and agree on the signals before starting. If visibility changes during the lift, stop and restore a clear way to communicate before continuing.
A phone voice-call app is another option to assess when the crew needs to speak between phones. The available facts do not establish the capabilities of any particular app. Check whether everyone can join the call, hear instructions at their working positions, and maintain communication throughout the lift.
Compare the options by how clearly the crane operator and signal person can exchange instructions at the site, what equipment the crew already has, and what backup method will be used if the main method fails. A phone-based signal display can support communication, but the crew still needs an agreed procedure for uncertainty or lost contact.
Common mistakes to avoid
Relying on a single communication method without a fallback can leave the crew uncertain when a signal is missed. Agree on what to do if contact is lost, and stop movement until the instructions are clear again.
Assuming every phone alerts in the same way can lead to missed signals. On Android browsers, signals such as STOP make the phone buzz, while iPhone Safari ignores the buzz. [1] Check what each device displays and whether its alerts can be noticed from the working position.
Leaving an old phone session open for another shift can cause confusion. An OperatorLink jobsite with nobody in it is wiped after 3 idle hours, and its link stops working 12 hours after the first person joins. [1] [1] Start a fresh session when necessary and confirm that the crew has joined it.
Forgetting that HOLD and SLOW remain active can also cause confusion. In OperatorLink, both signals stay on for everyone in the jobsite until the last person leaves. [1] Make sure the crew understands how these signals behave before work begins.
Another mistake is treating a displayed instruction as proof that the crane operator has received it. OperatorLink passes button presses, chat and voice between phones in a browser. [1] Confirm that the communication method is working and use the agreed stop procedure whenever a direction is unclear.
Frequently asked questions
How can solar farm crews guide tracker lifts with the crane operator?
Agree on who directs the lift, which signals or words the crew will use, and how the crane operator will confirm unclear instructions. Check the load path, working positions and visibility before lifting. Choose a communication method that works from the actual positions and establish a fallback if contact is lost. OperatorLink shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser. [1]
Can OperatorLink show crane lift signals on phones?
OperatorLink shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser. [1] The person starting the jobsite shares a link or QR code, and the crew joins from it. [1] Confirm that everyone who needs the signals has joined before the lift begins.
Is OperatorLink free for solar farm erection crews?
OperatorLink is currently free to use, and no paid plan is built yet. [1] It runs in a phone browser, so the crew does not need to install an app to join. [1] The phones still need a working data signal to pass button presses, chat and voice. [1] Check the connection at the work area before using it to communicate during a lift.
What happens when STOP is pressed in OperatorLink?
STOP releases every held direction on every phone and shows a full-screen alert to everyone else in the jobsite. [1] HOLD and SLOW behave differently because they stay on for everyone until the last person leaves the jobsite. [1] Explain these differences to the crew before starting. Agree on the procedure for confirming that the crane operator has understood an instruction before movement resumes.
Does OperatorLink work across open solar farm fields?
OperatorLink passes button presses, chat and voice between phones in a browser. [1] Check the phones' connection at the positions where the crew will stand and work. The available claims do not establish coverage at a particular solar farm. Keep an agreed backup communication method ready and stop movement if instructions cannot be exchanged clearly.
Do OperatorLink alerts buzz on iPhones?
On Android browsers, signals such as STOP make the phone buzz, while iPhone Safari ignores the buzz. [1] The crew should check how the signal appears on each phone before starting work rather than assuming all devices provide the same alert. Make sure the alert can be noticed from the working position. Agree on what to do if someone misses a signal or cannot confirm that an instruction arrived.
When does an OperatorLink jobsite link stop working?
An OperatorLink jobsite link stops working 12 hours after the first person joins it. [1] A jobsite with nobody in it is wiped after 3 idle hours. [1] For a later shift, start a fresh jobsite session if needed and share its new link or QR code with the crew. Confirm that everyone has joined the correct session before relying on its signals.
OperatorLink is currently free to use, and no paid plan is built yet. [1]
Try OperatorLinkSources
Related comparisons
- How to assess crane signal trainees passing calls clearly
- How to assign crane crews to jobs for crane dispatchers in 2026
- How to assign who gives signals during a pick for lift planners
- How MEWP crews call a stop near overhead hazards
- Calling material lifts to upper decks for scaffolding crews
- How to call hold during tight lifts for plant riggers
- How to call hold when a hose shifts under pressure
- Call hold when a load goes out of level
- Call HOLD when a load nears live process equipment
- How to call hold when a load shifts during a lift