2Dig Plain comparisons of crane signalling and jobsite communication tools

How to guide suspended sculptures onto display bases

Tool-neutral steps for museum installation crews guiding suspended sculptures onto display bases, with what to have ready and common mistakes.

By 2Dig ยท

2Dig is published by the makers of OperatorLink, which is compared here alongside other tools.

Plan who calls each move, check the route and the display base before lifting, and test every signal first. OperatorLink is one option. It shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser. [1]

OptionWhat it doesFeeCard fee
OperatorLinkShows STOP, HOLD and SLOW to the crew and passes button presses, chat and voice between phones in a browser [1]Currently free to use, with no paid plan built yet [1]not published
Two-way radionot publishednot publishednot published
Phone video call appnot publishednot publishednot published

What you need before you start

Before anything is lifted, the crew needs a written plan that names who calls each move and who has the final word on stopping. The conservator or registrar should approve the route and how the sculpture is held before the team touches it. Mark the target position on the floor of the display base, so the crew knows where the sculpture is going before it is in the air. Clear the path from the loading point to the base, and check that the base can take the sculpture's weight once it is set down. Make sure every person knows what each signal means, and agree how a stop is called, so nobody has to guess under pressure.

If the crew uses a phone-based signal tool, each phone needs a working browser and a connection for the whole move, because button presses, chat and voice pass between phones in a browser. [1] One person starts the session and shares a link or QR code, and the rest of the crew joins from it. [1] Start a fresh session for each move, since a jobsite with nobody in it is wiped after 3 idle hours. [1]

Step by step

  1. Walk the route with the whole crew before the sculpture leaves its stand, and agree who calls each move. Give the lead the final word on stopping.
  2. Mark the target position on the floor of the display base, and check that the base is clean, level and able to take the sculpture's weight.
  3. Pick the signals the crew will use, such as hand signals, a radio, or a phone tool, and test each one before the sculpture is lifted.
  4. If the crew uses OperatorLink, the person who starts the session shares a link or QR code, and the rest of the crew joins from it. [1]
  5. Lift the sculpture only a short distance and hold it steady while the lead checks clearance on all sides.
  6. Move slowly toward the base, with the lead calling each change of direction and everyone watching the sculpture rather than a screen. If the crew uses OperatorLink, a move button keeps sending its move to the other phones while it is held, and if the move stops arriving for 2 seconds, the other phones drop it. [1]
  7. Pressing STOP releases every held move on every phone and shows a full-screen alert to everyone else, so the crew stops and looks before moving again. [1]
  8. Set the sculpture down only when everyone confirms it sits correctly on the base.
  9. Keep the rigging in place until the lead and the conservator agree that the sculpture is supported, and only then release it.
  10. Record the final position. When the session is no longer needed, everyone leaves it, and remember that a jobsite with nobody in it is wiped after 3 idle hours. [1]

Tools that can do it

OperatorLink is made by the team that publishes this site. It shows STOP, HOLD and SLOW to the jobsite crew, and passes button presses, chat and voice between phones in a phone browser. [1] Nobody needs to install an app, because the tool runs in a phone browser. [1] Anyone who joins can take part in a voice call run from the phone browser. [1] Each crew member joins from the shared link or QR code. [1]

Two-way radio is a second option. No facts here describe one, so check that every crew member can hear the calls over the noise of the room, that the channel stays clear during the move, and that the crew agrees on plain spoken words.

A phone video call app is a third option. No facts here describe one, so check whether the call can stay open for the whole move, whether the lead can see the sculpture from the call, and whether the phone locks its screen during the move.

Match the option to the crew and the room, and keep a fallback ready for the whole move.

Common mistakes to avoid

Relying on one person to call every move. If that person cannot be seen or heard, the crew has no clear call, so name a second person who can call a stop.

Starting a lift before every crew member has confirmed the plan or joined the session. Check each phone and each voice before lifting.

Assuming every phone alerts the same way. On Android browsers, signals such as STOP make the phone buzz, while iPhone Safari ignores the buzz, so check the sound and the screen on every device. [1]

Forgetting that HOLD and SLOW stay on for everyone until the last person leaves, so a signal from an earlier move may still show. [1]

Using an old link for a new move. A jobsite link stops working 12 hours after the first person joins it, so start a fresh session when a new move begins. [1]

Letting the phone go to sleep during the move. Keep the screen awake and the page open on each phone. Adding the page to the home screen lets it open as a standalone app. [1]

Frequently asked questions

Is OperatorLink free to use?

OperatorLink is currently free to use, and no paid plan is built yet. [1] The tool runs in a phone browser, so there is no app to install before the crew starts. [1] Check the site for any later change before you plan a budget around it.

What does STOP do in OperatorLink?

STOP releases every move that someone is holding on every phone, and it shows a full-screen alert to everyone else in the session. [1] HOLD and SLOW work differently, because they stay on for everyone until the last person leaves the jobsite. [1] Agree in advance who may call a STOP, so the whole crew knows what the alert means when it appears on their phone.

How long does an OperatorLink jobsite link stay active?

A jobsite link stops working 12 hours after the first person joins it. [1] A jobsite with nobody in it is wiped after 3 idle hours, so a session left empty between moves may not be there when the crew returns. [1] For each new move, start a fresh session and share its new link or QR code with the crew.

Do STOP signals in OperatorLink buzz every phone?

On Android browsers, signals such as STOP make the phone buzz. [1] iPhone Safari ignores the buzz, so on an iPhone the crew should watch the screen for the alert. [1] Check the sound and screen settings on every phone before the move starts, so nobody misses a signal. Keep a voice or hand signal as a backup for anyone who cannot see their screen during the move.

Can OperatorLink carry voice calls during a move?

Anyone who joins the session can take part in a voice call run from the phone browser. [1] One-tap calls such as Go Ahead, Copy That and All Clear are sent as chat messages. [1] Use these calls for the moves, and keep a plain spoken plan for the crew in case a phone drops out of the session.

OperatorLink is currently free to use, and no paid plan is built yet. [1]

Try OperatorLink

Sources

  1. OperatorLink's own description of itself (the product of this site's publisher)

Related comparisons