How to guide roof sections into position for tank erection crews
Steps for tank erection crews to guide roof sections into position, what to have ready, tool options and common mistakes to avoid.
2Dig is published by the makers of OperatorLink, which is compared here alongside other tools.
Tank erection crews guide roof sections into position with a clear lift plan, one named signal person, and signals the whole crew agrees on before the first pick. One option for those signals is OperatorLink, which shows STOP, HOLD and SLOW to the crew on phone browsers. [1]
| Option | What it does | Fee | Card fee |
|---|---|---|---|
| OperatorLink | Shows STOP, HOLD and SLOW to the crew and passes button presses, chat and voice between phones in a browser [1] | Currently free to use, no paid plan built yet [1] | not published |
| Phone video call app | not published | not published | not published |
| Two-way radio | not published | not published | not published |
What you need before you start
Before any roof section moves, the crew needs the lift plan, the rigging checked, and one named signal person whom everyone can see. Agree on the signals before anyone is near the load, so nobody improvises a stop. Keep the route clear of people, and pick a spot where the signal person can see both the section and the crane operator. Decide who may call each move, and make sure every member knows who can call STOP. Check that every phone or radio has a working signal and a charged battery for the whole shift.
If the crew uses phones for signals, each phone needs a working browser and a data signal, because the signals pass between phones in a browser. [1] The person who starts the jobsite shares a link or QR code, and the rest of the crew joins from it. [1] A jobsite with nobody in it is wiped after 3 idle hours. [1]
Step by step
- Walk the route with the crew and mark the landing position for each roof section on the ground and on the tank.
- Confirm the lift plan covers each section's rigging points, weight and landing spot before the first pick.
- Name one signal person with a clear line of sight to the section and to the crane operator.
- Agree on the signal language before the lift starts, including what STOP means and who may call it.
- Test the signal method with the whole crew before the first section moves. If the crew uses OperatorLink, each member joins the session from the shared link on a phone browser, with no app install needed. [1]
- Guide each section in short moves, with the signal person calling each move and the crane operator confirming it. If OperatorLink is in use, a held move button keeps sending that move to the other phones, and if it stops arriving for 2 seconds, the other phones drop it. [1]
- Hold the section steady at the landing spot while the crew checks alignment with the tank's roof support points.
- Use HOLD when a section must stay put and SLOW when movement is close to the landing. If OperatorLink is in use, HOLD and SLOW stay on for everyone in the jobsite until the last person leaves. [1]
- Press STOP at the first sign of a problem. If OperatorLink is in use, STOP releases every held direction on every phone and shows a full-screen alert to everyone else. [1]
- Once a section is down and secure, confirm it before the next pick, then repeat the steps for the next section.
- At the end of the shift, everyone leaves the session. A jobsite left empty is wiped after 3 idle hours. [1]
Tools that can do it
OperatorLink is made by the team that publishes this site. It shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser. [1] [1] Nobody needs to install an app, because the page runs in a browser. [1] The person who starts a jobsite shares a link or QR code, and the crew joins from it. [1] A jobsite link stops working 12 hours after the first person joins it. [1] Anyone who joins can take part in a voice call, and one-tap calls such as Go Ahead, Copy That and All Clear are sent as chat messages. [1] [1] On Android browsers, signals such as STOP make the phone buzz, while iPhone Safari ignores the buzz. [1] OperatorLink is currently free to use, and no paid plan is built yet. [1] The app can also be added to a phone's home screen as a standalone app. [1]
A phone video call app is a second option. No facts here describe one, so check whether the crew can keep the call open for the whole shift, whether the signal person's hands stay in view, and whether the phone locks its screen mid-lift.
A two-way radio is a third option. No facts here describe one, so check that the crew agrees on plain voice, that every member can be heard over machine noise, and that the channel stays clear through the lift.
Match the option to the crew and the site, and keep a fallback ready, since a phone signal can drop.
Common mistakes to avoid
Relying on one phone for STOP. If that phone loses its data signal, the rest of the crew may not see the signal, so keep a voice or hand option ready.
Assuming every phone alerts the same way. On Android browsers, signals such as STOP make the phone buzz, while iPhone Safari ignores the buzz, so check the sound and screen on every device. [1]
Leaving a jobsite open and expecting it to last. A jobsite with nobody in it is wiped after 3 idle hours. [1]
Forgetting that HOLD and SLOW stay on for everyone until the last person leaves, so plan for them to remain on through the shift. [1]
Reusing an old link. A jobsite link stops working 12 hours after the first person joins it, so share a fresh link for each shift. [1]
Letting the phone go to sleep during a lift. Check the screen settings before the lift starts.
Frequently asked questions
Is OperatorLink free to use for tank erection crews?
OperatorLink is currently free to use, and no paid plan is built yet. [1] It runs in a phone browser with no app install, so each phone needs a working browser and a data signal. [1] [1] Check the data plan on each phone before relying on it for a whole shift, since the signals pass between phones over a data connection.
What does the STOP signal do in OperatorLink?
STOP releases every held direction on every phone in the session and shows a full-screen alert to everyone else. [1] HOLD and SLOW work differently, because they stay on for everyone in the jobsite until the last person leaves. [1] Keep this difference in mind when agreeing on the signal language before a lift, so the crew knows which signals will still be showing once STOP has been cleared.
How long does an OperatorLink jobsite link stay active?
A jobsite link stops working 12 hours after the first person joins it. [1] A jobsite with nobody in it is wiped after 3 idle hours. [1] For a new shift, the person who starts the jobsite shares a new link or QR code, and the crew joins from that. [1]
Does OperatorLink buzz the phone on iPhone when STOP is pressed?
On Android browsers, signals such as STOP make the phone buzz. [1] iPhone Safari ignores the buzz, so an iPhone will not vibrate for a STOP signal. Everyone else in the session still sees a full-screen alert when STOP is pressed. [1] Check the sound and screen settings on every phone before the lift, so nobody misses a signal.
Can OperatorLink carry voice calls during a roof section lift?
Anyone who joins the jobsite can take part in a voice call run from the phone browser. [1] One-tap radio-style calls such as Go Ahead, Copy That and All Clear are sent as chat messages. [1] Voice depends on each phone's data signal, so keep a hand signal or a radio as a fallback for the lift.
OperatorLink is currently free to use, and no paid plan is built yet. [1]
Try OperatorLinkSources
Related comparisons
- How to assess crane signal trainees passing calls clearly
- How to assign crane crews to jobs for crane dispatchers in 2026
- How to assign who gives signals during a pick for lift planners
- How MEWP crews call a stop near overhead hazards
- Calling material lifts to upper decks for scaffolding crews
- How to call hold during tight lifts for plant riggers
- How to call hold when a hose shifts under pressure
- Call hold when a load goes out of level
- Call HOLD when a load nears live process equipment
- How to call hold when a load shifts during a lift