How to guide pipe sections into a trench with an operator
Steps for culvert and pipe installers guiding pipe sections into a trench with the operator, what to have ready, and common mistakes to avoid.
2Dig is published by the makers of OperatorLink, which is compared here alongside other tools.
Guiding a pipe section into a trench takes a person in the trench, a signal person on the ground, and an operator running the lift, all working from the same signals. Agree on those signals before the first section leaves the ground, and keep a backup signal ready in case the main one fails. OperatorLink is one option that lets the crew send STOP, HOLD and SLOW to each other's phones in a phone browser [1].
| Option | What it does | Fee | Card fee |
|---|---|---|---|
| OperatorLink | Shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser [1] | Currently free to use, and no paid plan is built yet [1] | not published |
| Two-way radio | No facts on this page describe it; check hearing and channel clarity on site | not published | not published |
| Hand signals from a signal person | No facts on this page describe it; check sightlines from the operator's position | not published | not published |
| Phone video call app | No facts on this page describe it; check call stability for the whole shift | not published | not published |
What you need before you start
Before the first pipe section comes off the truck, the crew should agree who is in the trench, who is on the ground as the signal person, and who runs the lift from the operator's position. The signal person should be able to see the load, the operator and the trench wall at the same time. Pick a spot for the signal person that keeps them clear of the load path and the trench edge.
Have the lift gear checked and in place before the day starts, and make sure the pipe section, slings and tag lines are ready at the trench edge. Agree on the hand signals and short calls the crew will use, and make sure everyone knows what a stop call means before the lift begins. Keep a radio or a second signal option ready in case the main one fails.
If the crew uses a phone-based signal tool, every phone needs a working browser and a data signal for the whole shift. One person starts the session and shares a link or QR code with the rest of the crew, so everyone can join before the lift starts [1] [1].
Step by step
- Confirm the operator can see the signal person and the trench from the operator's position before any lift starts.
- Have the signal person stand clear of the load path and the trench edge, at a spot where the operator can see them.
- Agree on the signals for stop, hold and slow before the first section leaves the ground, and call them out loud as well as signaling them.
- Set tag lines on the pipe section so the ground crew can steer it without reaching into the load path.
- Lift the section slowly to just above the trench, and pause there while the installer in the trench reads the pipe's position.
- Have the installer in the trench give the signal person a short call on the final position, and the signal person relays it to the operator.
- Lower the section only after the operator has confirmed the signal and the installer has hands and feet clear of the pipe ends and the trench wall.
- Set the section on the bedding, release the slings only once the pipe is stable, and check the joint before the next section comes down.
- If any signal is unclear, stop the lift and return to the hold position until the crew has confirmed the next move.
- At the end of the shift, note which sections are in place and leave the trench clear of loose tools and slings.
Tools that can do it
OperatorLink is made by the team that publishes this site. It lets the crew send STOP, HOLD and SLOW to each other's phones, and passes button presses, chat and voice between phones in a phone browser [1]. STOP releases every held direction on every phone and shows a full-screen alert to everyone else [1]. HOLD and SLOW stay on for everyone in the jobsite until the last person leaves [1]. Holding a move button keeps sending that move to the other phones, and if it stops arriving for 2 seconds, the other phones drop it [1]. One-tap calls such as Go Ahead, Copy That and All Clear are sent as chat messages [1]. Anyone who joins can take part in a voice call run from the phone browser [1]. The app runs in a phone browser with no app install needed [1].
Two-way radio is a second option. No facts on this page describe one, so check that the whole crew can hear each other over the machinery and that the channel stays clear for the full lift.
Hand signals given by a signal person are a third option and need no equipment. No facts on this page describe them, so check that the operator can see the signal person at every stage of the lift and that the signal person stays out of the load path.
A phone video call app is a fourth option. No facts on this page describe one, so check whether the call stays open for the whole shift and whether the phone screen stays on in the signal person's hand.
Match the option to the crew and the site, and keep a backup ready, because a phone's data signal can drop during a shift.
Common mistakes to avoid
Relying on one signal for every move. If the main signal fails, the trench crew needs a second way to call a stop, so keep a voice or hand option ready.
Assuming every phone alerts the same way. On Android browsers, signals such as STOP make the phone buzz, while iPhone Safari ignores the buzz, so check the screen and sound on every phone before the lift [1].
HOLD and SLOW stay on for everyone in the jobsite and are cleared when the last person leaves. [1]
Reusing an old link on a new shift. A jobsite link stops working 12 hours after the first person joins it [1].
Leaving a session empty over a break and expecting it to still be there. A jobsite with nobody in it is wiped after 3 idle hours [1].
Letting go of a move button and assuming the move continues. If the move stops arriving for 2 seconds, the other phones drop it [1].
Skipping the pre-lift check. Confirm that every crew member can see the signals before the first section leaves the ground.
Frequently asked questions
Is OperatorLink free to use?
OperatorLink is currently free to use, and no paid plan is built yet [1]. It runs in a phone browser, so each phone still needs a working data signal for the shift. Check each phone's data plan before the crew relies on it for a lift, and keep a radio or hand signal ready as a fallback.
What does the STOP button do in OperatorLink?
STOP releases every held direction on every phone and shows a full-screen alert to everyone else in the session [1]. HOLD and SLOW behave differently, because they stay on for everyone until the last person leaves the jobsite [1]. Agree with the crew on which signal does what before the lift starts.
How long does an OperatorLink jobsite link last?
A jobsite link stops working 12 hours after the first person joins it [1]. A jobsite with nobody in it is wiped after 3 idle hours, so a session left empty over a break may need to be started again [1]. Share a fresh link or QR code with the crew at the start of each shift.
Do STOP alerts buzz on every phone with OperatorLink?
On Android browsers, signals such as STOP make the phone buzz [1]. STOP releases every held direction on every phone and shows a full-screen alert to everyone else. [1] Check the screen and sound on every phone before the lift. Adding the page to the home screen lets it open as a standalone app [1].
Can the crew talk by voice during a pipe lift with OperatorLink?
Anyone who joins the jobsite can take part in a voice call run from the phone browser [1]. One-tap calls such as Go Ahead, Copy That and All Clear are sent as chat messages [1]. Voice depends on each phone's data signal, so keep hand signals or a radio as a fallback for the lift.
OperatorLink is currently free to use, and no paid plan is built yet. [1]
Try OperatorLinkSources
Related comparisons
- How to assess crane signal trainees passing calls clearly
- How to assign crane crews to jobs for crane dispatchers in 2026
- How to assign who gives signals during a pick for lift planners
- How MEWP crews call a stop near overhead hazards
- Calling material lifts to upper decks for scaffolding crews
- How to call hold during tight lifts for plant riggers
- How to call hold when a hose shifts under pressure
- Call hold when a load goes out of level
- Call HOLD when a load nears live process equipment
- How to call hold when a load shifts during a lift