Steps, checks and tool options for precast concrete installers to coordinate set-down with the setting crew, with signal options compared.

By 2Dig ยท

2Dig is published by the makers of OperatorLink, which is compared here alongside other tools.

Set-down runs more smoothly when the crane operator, the signal person and the setting crew agree on one plan before the element leaves the truck. Settle who calls each move, how each signal is passed, and what happens if someone calls stop. Rehearse the sequence before the first element, then review it after each set-down.

OptionWhat it doesFeeCard fee
OperatorLinkShows STOP, HOLD and SLOW to the crew and passes button presses, chat and voice between phones in a browser [1]Currently free to use, no paid plan built yet [1]not published
Phone video call appnot publishednot publishednot published
Two-way radionot publishednot publishednot published

What you need before you start

Before the element leaves the truck, the precast installers and the setting crew need one shared plan. Name the signal person, who passes each move from the ground to the crane operator, and name the setting crew lead, who decides when the element is in place. Mark the drop point on the ground and walk the route with the crew so everyone knows where the element is going and where people will stand. Agree on the order of moves, for example lower, hold, then shift, so the setting crew knows what to expect at each stage. Settle the signal words for stop, hold and slow, and confirm that the crane operator can see or hear the signal person from the cab. Bring a backup way to pass signals, such as a radio or hand signals, in case one channel fails. Write the plan on one card or sheet that the signal person and the setting crew lead both keep, and make sure every person on the set-down has seen it before the first lift.

Step by step

Work through these steps in order for each element.

  1. Confirm the lift plan with the crane operator and the setting crew lead, including the drop point, the route and the order of moves. Say the plan out loud so each person hears the same version.
  2. Check that the signal person can see both the element and the setting crew at all times. If that view is blocked, move the signal person before the lift, not during it.
  3. Agree on the signal words before the lift starts, and make sure the crane operator repeats each signal back. Repeating back catches a misheard call early.
  4. Have the setting crew lead confirm the drop point is clear of people and loose material before the crane moves the element toward it.
  5. Lower the element slowly, with the signal person calling each small move. Keep hands and feet out of the path until the element is close.
  6. Hold the element a short distance above the drop point while the setting crew checks alignment. Do not let anyone reach in to guide it before that check is done.
  7. Make small adjustments only when the setting crew lead calls them, and have the signal person repeat each adjustment before the crane moves.
  8. When the element is seated, the setting crew lead confirms it is secure and calls clear for the crane to release. Wait for that call before any slack is taken.
  9. If anyone calls stop, stop all movement at once and wait until the signal person confirms the crew is clear before moving again.
  10. After set-down, the crew reviews what went well and what to change for the next element, and writes the notes on the same plan sheet.

Tools that can do it

OperatorLink is made by the team that publishes this site. It shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser. [1] Nobody needs to install an app, because the page runs in a browser. [1] Whoever starts a jobsite shares a link or QR code, and the crew joins from it. [1]

STOP ends every move that is being held down on every phone and shows a full-screen alert to everyone else. [1] HOLD and SLOW stay on for everyone until the last person leaves the jobsite. [1] Holding a move button keeps sending that move to the other phones, and if it stops arriving for 2 seconds, they drop it. [1]

One-tap calls such as Go Ahead and All Clear are sent as chat messages. [1] Anyone who joins can also take part in a voice call run from the phone browser. [1]

A phone video call app is a second option. No facts are available here about one, so check whether the crew can keep the call open for the whole set-down, whether the signal person stays in view of the crane operator, and whether the phone locks its screen during the lift.

A two-way radio is a third option. No facts are available here about one, so check that the crew agrees on plain words, that every member can hear over machine noise, and that the channel stays clear through the lift.

Match the option to the crew and the site, and keep a fallback ready in case a phone drops out during the lift.

Common mistakes to avoid

Relying on one channel for stop calls. Signals pass between phones in a browser, so keep a voice or hand option ready in case a phone drops out. [1]

Assuming every phone alerts the same way. On Android browsers, signals such as STOP make the phone buzz, while iPhone Safari ignores the buzz, so check the sound and screen on every device. [1]

Leaving an empty session open and expecting it to be ready for the next set-down. A jobsite with nobody in it is wiped after 3 idle hours. [1]

Reusing an old link. A jobsite link stops working 12 hours after the first person joins it. [1]

Forgetting that HOLD and SLOW stay on until the last person leaves. The crew has to clear them on purpose. [1]

Assuming a move is still arriving. If a move stops arriving for 2 seconds, the other phones drop it. [1]

Keeping the page in a browser tab during the lift. Adding the page to the home screen lets it open as a standalone app, so it is ready when the lift starts. [1]

Frequently asked questions

Is OperatorLink free to use for precast set-down work?

OperatorLink is currently free to use, and no paid plan is built yet. [1] Because it runs in a phone browser, each phone still needs a working data signal for the whole set-down. Check your phones' data plans before the day, and keep a voice or hand option ready as a fallback in case a phone drops out during the lift.

Does OperatorLink show STOP to the whole setting crew?

STOP ends every move that is being held down on every phone and shows a full-screen alert to everyone else. [1] That means the setting crew sees the alert on their own phones, not only the signal person. HOLD and SLOW behave differently, because they stay on for everyone until the last person leaves the jobsite. [1] Agree on that difference before the lift starts.

How long does an OperatorLink jobsite link stay active?

A jobsite link stops working 12 hours after the first person joins it. [1] A jobsite with nobody in it is wiped after 3 idle hours. [1] For a new shift or a new set-down, start a fresh session and share the new link or QR code with the crew, so nobody is working from an old link.

Do STOP signals buzz every phone in OperatorLink?

On Android browsers, signals such as STOP make the phone buzz. [1] iPhone Safari ignores the buzz, so an iPhone user may only see the alert on screen. Check the sound and screen on every phone in the crew before the element starts moving, so nobody misses a stop.

Can OperatorLink carry voice calls between the crane operator and the setting crew?

Anyone who joins the jobsite can take part in a voice call run from the phone browser. [1] One-tap calls such as Go Ahead and All Clear go out as chat messages. [1] Voice depends on each phone's data signal, so keep a radio or hand signal as a fallback for the lift.

OperatorLink is currently free to use, and no paid plan is built yet. [1]