Coordinate segment and equipment lowering for tunnel crews
How tunnel and shaft crews coordinate segment and equipment lowering: what to have ready, the steps, tool choices and mistakes to avoid.
2Dig is published by the makers of OperatorLink, which is compared here alongside other tools.
When a segment or piece of equipment lowers into a shaft, the crew and the operator work from one set of stop, hold and slow signals agreed before the load moves. The crew runs one jobsite session in a phone browser, with the starter sharing a link or QR code. [1] [1] STOP releases every held direction and shows a full-screen alert to everyone else, while HOLD and SLOW stay on for everyone in the jobsite and are cleared when the last person leaves. [1] [1] The phone needs a working data signal, iPhone Safari does not buzz on alert, and an idle session is wiped after 3 hours, so have a voice or hand fallback ready. [1] [1]
| Option | What it does | Fee | Card fee |
|---|---|---|---|
| OperatorLink | Shows STOP, HOLD and SLOW to the crew and passes button presses, chat and voice between phones in a browser [1] | Currently free to use, no paid plan built yet [1] | not published |
| Phone video call app | not published | not published | not published |
| Two-way radio | not published | not published | not published |
What you need before you start
Button presses, chat and voice pass between phones in a browser. [1] The person who starts the jobsite needs to share a link or QR code, and the rest of the crew joins from it. [1] If everyone leaves the session and it sits empty, it is wiped after 3 idle hours. [1] Before the first segment lowers, name who gives the signals and where that person stands with a clear view of the load. Agree in advance how the load is held, the order the segments and pieces of equipment come down, and what a stop, hold or slow means this shift. HOLD and SLOW stay on for everyone in the jobsite and are cleared when the last person leaves. [1] Before work starts, add the page to each phone's home screen so it opens as a standalone app. [1]
Step by step
- Check each phone has a working browser and a data signal for the whole lowering shift, because the signals pass between phones in a browser. [1]
- Open the session from a phone browser, with no app install needed. [1]
- That person shares the link or QR code with the crew at the surface and in the shaft, and each member joins from it. [1]
- Confirm every crew member is in the session before the load moves, so each one sees the same signals. [1]
- Agree on the move plan before the first lift: the signal person stands where the load and the target are both visible, says what is coming down and when it moves, and confirms the path is clear. Anyone who spots a problem uses the same stop signal, not only the person giving directions.
- Agree on which signals stay on: HOLD and SLOW stay on for everyone in the jobsite and are cleared when the last person leaves. [1]
- Run the move with short holds: the operator presses and holds the move control so the phones keep sending that direction, and the other phones drop it if it stops arriving for 2 seconds. [1]
- STOP releases every held direction on every phone and shows a full-screen alert to everyone else. [1]
- At the end of the shift, everyone leaves the session, and remember that a jobsite with nobody in it is wiped after 3 idle hours. [1]
Between moves, use the voice channel to tell the crew what happens next, and keep the stop signal easy to reach for the whole shift. For a lowering move over people, hold the load until the path is clear and everyone confirms they are set. Confirm the plan covers handover at the bottom: who receives the segment at the base of the shaft, who unhooks it, and who gives the signal to release the load. Keep the phones somewhere dry and visible, since a shaft is a wet, dirty working area, and set the stop signal before each load moves so the operator does not rely on memory between lifts. Do not treat the phones as the only channel; keep the plan for the move on open voice.
Tools that can do it
OperatorLink is made by the team that publishes this site. It shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser. [1] [1] Nobody needs to install an app; the page runs in a browser. [1] The person who starts a jobsite shares a link or QR code, and the crew joins from it. [1] Anyone who joins can take part in a voice call run from the phone browser, and one-tap calls such as Go Ahead, Copy That and All Clear go out as chat messages. [1] [1] For a lowering job, this option puts a stop that everyone sees at once on the same screen, and lets the crew take part in a voice call from the phone browser. [1] [1] Button presses, chat and voice pass between phones in a browser. [1]
A phone video call app is a second option. No facts here describe one, so check whether the crew can keep the call open for the whole shift, whether the signal person's hands stay in view, and whether the phone locks its screen mid-lift.
A two-way radio is a third option. No facts here describe one, so check that the crew agrees on plain voice, that every member can be heard over machine noise, and that the channel stays clear through the lift.
Match the option to the crew and the site, and keep a fallback ready since signals in a browser depend on the phone's data signal. For a deep shaft, confirm in advance whether a data signal reaches the base before relying on a browser or video call.
Common mistakes to avoid
Assuming every phone alerts the same way: on Android browsers, signals such as STOP make the phone buzz, while iPhone Safari ignores the buzz. [1] Leaving an empty session: a jobsite with nobody in it is wiped after 3 idle hours. [1] Forgetting that HOLD and SLOW stay on for everyone in the jobsite and are cleared when the last person leaves. [1] Not confirming that a move still arrives: if a move stops arriving for 2 seconds, the other phones drop it. [1] Letting the phone go to sleep mid-lift; the page can be added to the home screen as a standalone app. [1]
Frequently asked questions
Is OperatorLink free to use?
OperatorLink is currently free to use, and no paid plan is built yet. [1] The signals are shown through a phone browser, so each phone still needs a working data signal for the whole shift. Check the phone's data coverage at the base of the shaft before relying on it, and keep a radio as a fallback.
What happens when the STOP button is pressed?
STOP releases every held direction on every phone in the session and shows a full-screen alert to everyone else. HOLD and SLOW behave differently: they stay on for everyone until the last person leaves the jobsite. Plan how the crew clears HOLD and SLOW on purpose before the next move.
How long does a jobsite link stay active?
A jobsite link stops working 12 hours after the first person joins it, so a link from an earlier shift may no longer open the session. A jobsite with nobody in it is wiped after 3 idle hours. For a fresh shift, check that everyone joins before the first load moves.
Do STOP signals buzz on every phone?
On Android browsers, signals such as STOP make the phone buzz. iPhone Safari ignores the buzz. In a noisy shaft or tunnel, rely on sight as well as sound.
Can crew members talk over the phone during a lower?
Anyone who joins the jobsite can take part in a voice call run from the phone browser, and one-tap calls such as Go Ahead, Copy That and All Clear are sent as chat messages. Voice depends on the phone's data signal, which may be weak at the base of a deep shaft, so keep a radio or hand signal as a fallback.
OperatorLink is currently free to use, and no paid plan is built yet. [1]
Try OperatorLinkSources
Related comparisons
- How to assess crane signal trainees passing calls clearly
- How to assign crane crews to jobs for crane dispatchers in 2026
- How to assign who gives signals during a pick for lift planners
- How MEWP crews call a stop near overhead hazards
- Calling material lifts to upper decks for scaffolding crews
- How to call hold during tight lifts for plant riggers
- How to call hold when a hose shifts under pressure
- Call hold when a load goes out of level
- Call HOLD when a load nears live process equipment
- How to call hold when a load shifts during a lift