2Dig Plain comparisons of crane signalling and jobsite communication tools

How to coordinate ride section lifts with a crane operator

Steps for amusement ride installers to coordinate ride section lifts with the crane operator, with what to have ready, tool options and common mistakes.

By 2Dig ยท

2Dig is published by the makers of OperatorLink, which is compared here alongside other tools.

OperatorLink shows STOP, HOLD and SLOW to the crew on their phone browsers, with no app install. [1] [1] For an amusement ride section lift, the installers and the crane operator agree on the signals, share one session link, and check that every phone shows the alerts before the first section moves.

OptionWhat it doesFeeCard fee
OperatorLinkShows STOP, HOLD and SLOW to the crew and passes button presses, chat and voice between phones in a browser [1]Currently free to use, no paid plan built yet [1]not published
Phone video call appnot publishednot publishednot published
Two-way radionot publishednot publishednot published

What you need before you start

Before the first section is lifted, the installers and the crane operator need to agree on who gives each signal and which section moves first. Anyone on the crew can call a stop, so everyone should know that any STOP is to be obeyed at once. Button presses, chat and voice pass between phones in a browser. [1] Before the lift, have each person check the signals from their actual working position, since a signal that is clear from one spot may not be clear from another. The person who starts the jobsite shares a link or QR code, and each installer joins from it. [1] A jobsite link stops working 12 hours after the first person joins it, so start the session close to the start of the lift. [1] A jobsite with nobody in it is wiped after 3 idle hours, so do not open the session long before the crew is ready. [1] Know that HOLD and SLOW stay on for everyone in the jobsite and are cleared when the last person leaves. [1]

Step by step

  1. Walk the lift with the crane operator and every installer before the first section moves, and agree on the order of sections and the signal for each move.
  2. Confirm every phone has a working browser, since button presses, chat and voice pass between phones in a browser. [1]
  3. Open the session from a phone browser. No app install is needed. [1]
  4. Share the link or QR code with the crane operator and the installers, and confirm each one has joined. [1]
  5. Confirm that STOP, HOLD and SLOW appear on every phone before the lift begins. [1]
  6. HOLD and SLOW stay on for everyone in the jobsite and are cleared when the last person leaves. [1]
  7. Holding a move button keeps sending that move to the other phones; if it stops arriving for 2 seconds, they drop it. [1]
  8. Confirm each step with one-tap calls such as Go Ahead, Copy That and All Clear, which are sent as chat messages. [1]
  9. When STOP is pressed, every held direction is released on every phone and a full-screen alert appears on the others, so everyone stops and confirms before the lift resumes. [1]
  10. After the last section is set, everyone leaves the session. A jobsite with nobody in it is wiped after 3 idle hours. [1]

Tools that can do it

OperatorLink is made by the team that publishes this site. It shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser. [1] [1] Nobody needs to install an app, because the page runs in the browser. [1] A crew that wants signal buttons and calls in a phone browser can use it for that purpose. [1]

A phone video call app is one more way to talk during a lift. No facts here describe one, so check whether the call can stay open for the whole shift, whether the signal person's hands stay in view, and whether the phone locks its screen mid-lift.

A two-way radio is another way to talk during a lift. No facts here describe one, so check that the crew agrees on plain voice calls, that every member can hear over the machine noise, and that the channel stays clear through the lift.

Match the option to the crew and the site, and keep a second way to call the crew ready, since any phone-based option depends on the phone working throughout the shift.

Common mistakes to avoid

Relying on one phone for STOP. Each STOP reaches the crew through the phones in the session, so confirm that every installer and the crane operator can see the alert on their own phone before the lift. [1]

Assuming every phone alerts the same way. On Android browsers, signals such as STOP make the phone buzz, while iPhone Safari ignores the buzz, so check sound and screen on every phone before the lift. [1]

Leaving HOLD or SLOW on after the move is done. HOLD and SLOW stay on for everyone in the jobsite and are cleared when the last person leaves. [1]

Using an old link from an earlier shift. A link stops working 12 hours after the first person joins it, so share a fresh link or QR code for each shift. [1]

Trusting a held move without checking it. If a move stops arriving for 2 seconds, the other phones drop it, so the operator should confirm each move is still arriving. [1]

Letting the phone lock its screen mid-lift. Add the page to the home screen as a standalone app so it opens like an app. [1] The facts here do not say how a phone behaves while its screen is locked, so check the phone's screen settings before the lift.

Expecting an empty session to wait for the next day. A jobsite with nobody in it is wiped after 3 idle hours. [1]

Frequently asked questions

Is OperatorLink free to use for amusement ride installers?

OperatorLink is currently free to use, and no paid plan is built yet. [1] Because it runs in a phone browser, the phones join through the browser rather than a separate app install. [1] Confirm the current price before relying on the tool for a job, since the facts available here cover only the current free use.

What happens on OperatorLink when STOP is pressed during a section lift?

STOP releases every held direction on every phone in the jobsite and shows a full-screen alert to everyone else. [1] HOLD and SLOW work differently, because they stay on for everyone until the last person leaves the jobsite. [1] After a STOP, the crane operator and the installers should agree on when to resume the move.

How long does an OperatorLink jobsite link stay active?

A jobsite link stops working 12 hours after the first person joins it. [1] A jobsite with nobody in it is wiped after 3 idle hours. [1] A link that has passed its 12 hours will no longer open the session, so share a new link or QR code with the crew if the lift runs past that time.

Does OperatorLink buzz every phone when a STOP signal arrives?

On Android browsers, signals such as STOP make the phone buzz. [1] iPhone Safari ignores the buzz, so check the screen as well on iPhones. [1] Check the sound and screen settings on every phone in the crew before the lift begins.

Can OperatorLink carry voice calls between the crane operator and installers?

Anyone who joins the jobsite can take part in a voice call run from the phone browser. [1] One-tap calls such as Go Ahead, Copy That and All Clear are sent as chat messages. [1] Keep a second way to call the crew ready in case a phone drops out during the lift.

OperatorLink is currently free to use, and no paid plan is built yet. [1]

Try OperatorLink

Sources

  1. OperatorLink's own description of itself (the product of this site's publisher)

Related comparisons