Coordinating rooftop crane picks for HVAC lift crews
Steps for HVAC lift crews to plan several rooftop picks in one crane session, with a phone signal option, common mistakes and what to check.
2Dig is published by the makers of OperatorLink, which is compared here alongside other tools.
Agree on the pick order and one signal person before the session starts, then run each pick with the same signals for the whole crew. OperatorLink is one option for passing those signals between phones: it shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser. [1] [1]
| Option | What it does | Fee | Card fee |
|---|---|---|---|
| OperatorLink | Shows STOP, HOLD and SLOW to the crew and passes button presses, chat and voice between phones in a browser [1] | Currently free to use, no paid plan built yet [1] | not published |
| Phone video call app | not published | not published | not published |
| Two-way radio | not published | not published | not published |
What you need before you start
Before the first pick, the crew needs a written plan for every rooftop unit: its weight, its landing spot on the roof, and the order it comes off the truck. Check the crane's load chart for the radius and load of each pick, and confirm the operator has it. Name one signal person who gives every signal for the whole session, and make sure the operator can see or hear that person at all times.
If the crew uses phones for signals, each phone needs a working browser and a data signal for the whole shift, because the signals pass between phones in a browser. [1] The person who starts the jobsite shares a link or QR code, and the rest of the crew joins from it. [1] Agree before the lift which signals stay on for everyone, since HOLD and SLOW stay on until the last person leaves the jobsite. [1]
Step by step
- Write the full pick list for the session: each unit, its order, its landing spot and the rigger for it.
- Walk the roof with the operator's view in mind, and mark each landing spot, any obstruction and where the crew stands.
- Review the load chart for each pick and confirm the radius and load with the operator before the first lift.
- Brief the whole crew on the sequence and on who calls each pick.
- Choose the signal method for the session and test it before the first lift. If the crew uses phones, confirm every crew member has joined, so each one sees the same signals. [1]
- Start each pick with a single call from the signal person, and hold the load until the operator confirms it is clear to move.
- Before each pick, confirm that no earlier hold or slow still applies to the next move.
- When anyone calls STOP, every move stops and the crew pauses to look before moving again. In a phone session, STOP releases every held direction on every phone and shows a full-screen alert to everyone else. [1]
- Holding a move button keeps sending that move to the other phones, and if it stops arriving for 2 seconds, they drop it, so keep the button held only while the move is needed. [1]
- Once the last pick is set, a jobsite with nobody in it is wiped after 3 idle hours. [1]
Tools that can do it
OperatorLink is made by the team that publishes this site. It shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser. [1] [1] Nobody needs to install an app, because the page runs in a browser. [1] One-tap radio-style calls are sent as chat messages. [1] Anyone who joins can take part in a voice call run from the phone browser. [1]
Match the option to the crew and the site, and keep a fallback ready. Button presses, chat and voice pass between phones in a browser. [1]
Common mistakes to avoid
Relying on one phone for STOP: button presses, chat and voice pass between phones in a browser, so keep a voice or hand option ready as a fallback. [1] Assuming every phone alerts the same way: on Android browsers, signals such as STOP make the phone buzz, while iPhone Safari ignores the buzz, so check the sound and screen on every device. [1] Reusing a link from an earlier shift: a jobsite link stops working 12 hours after the first person joins it. [1] Leaving a session empty over a break: a jobsite with nobody in it is wiped after 3 idle hours. [1] Forgetting that HOLD and SLOW stay on for everyone in the jobsite and are cleared when the last person leaves. [1] Not checking that a move still arrives: if it stops arriving for 2 seconds, the other phones drop it. [1]
Frequently asked questions
Is OperatorLink free to use?
OperatorLink is currently free to use, and no paid plan is built yet. [1] Button presses, chat and voice pass between phones in a browser. [1] Button presses, chat and voice pass between phones in a browser. [1]
What happens when STOP is pressed on OperatorLink?
STOP releases every held direction on every phone in the session and shows a full-screen alert to everyone else. [1] HOLD and SLOW behave differently, because they stay on for everyone until the last person leaves the jobsite. [1] Keep a voice or hand signal ready as a second way to call a stop, so the crew is not relying on a single phone.
How long does an OperatorLink jobsite link stay active?
A jobsite link stops working 12 hours after the first person joins it, so a link from an earlier shift may no longer open the session. [1] A jobsite with nobody in it is wiped after 3 idle hours. [1] The person who starts a jobsite shares a link or QR code, and the crew joins from it. [1]
Do STOP signals make every phone buzz?
No. [1] On Android browsers, signals such as STOP make the phone buzz. [1] iPhone Safari ignores the buzz, so an iPhone may show the full-screen alert on screen without any buzz. [1] [1] Check the sound and screen on every phone before the first pick, so nobody misses a signal.
Can crew members talk by voice on OperatorLink during a rooftop session?
Anyone who joins the jobsite can take part in a voice call run from the phone browser. [1] One-tap radio-style calls are sent as chat messages. [1] Button presses, chat and voice pass between phones in a browser. [1]
OperatorLink is currently free to use, and no paid plan is built yet. [1]
Try OperatorLinkSources
Related comparisons
- How to assess crane signal trainees passing calls clearly
- How to assign crane crews to jobs for crane dispatchers in 2026
- How to assign who gives signals during a pick for lift planners
- How MEWP crews call a stop near overhead hazards
- Calling material lifts to upper decks for scaffolding crews
- How to call hold during tight lifts for plant riggers
- How to call hold when a hose shifts under pressure
- Call hold when a load goes out of level
- Call HOLD when a load nears live process equipment
- How to call hold when a load shifts during a lift