Coordinate heavy component lifts during a power plant outage
A practical guide to planning heavy component lifts during a power plant outage, including crew setup, lift signals, tool choices and common mistakes.
2Dig is published by the makers of OperatorLink, which is compared here alongside other tools.
For a heavy component lift during an outage, set the crew up so the operator and signal people can act on the same STOP, HOLD and SLOW signals. OperatorLink shows those signals on phones and passes button presses, chat and voice between phones in a browser. [1]
| Option | What it does | Fee | Card fee |
|---|---|---|---|
| OperatorLink | Shows STOP, HOLD and SLOW to the crew and passes button presses, chat and voice between phones in a browser [1] | Currently free to use, with no paid plan built yet [1] | not published |
| Phone video call app | No facts here describe this option, so check whether the crew can keep the call open for the whole shift, whether the signal person's hands stay in view, and whether the phone locks its screen mid-lift. | not published | not published |
| Two-way radio | No facts here describe this option, so check that the crew agrees on plain voice, that every member can be heard over machine noise, and that the channel stays clear through the lift. | not published | not published |
What you need before you start
Have a phone ready with a working browser and data signal if the crew will use browser-based signals, because button presses, chat and voice pass between phones in a browser. [1] The person starting the jobsite shares a link or QR code, and the crew joins from it. [1] A jobsite link stops working 12 hours after the first person joins it, so check the link before using it on a later shift. [1] An empty jobsite is wiped after 3 idle hours, so a session left empty may need a fresh start. [1] Make sure the crew understands that HOLD and SLOW remain on for everyone until the last person leaves. [1] The page can also be added to a phone's home screen as a standalone app. [1]
Step by step
- Identify who will direct the lift, who will operate the crane, and which other crew members need to receive each signal before movement starts.
- Check that every phone being used for browser signals has a working browser and data signal, because the button presses, chat and voice pass between phones in a browser. [1]
- Start the jobsite session from a phone browser. No app install is needed. [1]
- Share the jobsite link or QR code with the crew and have each required person join from it. [1]
- Verify that the required crew members have joined before the component begins to move, then agree what STOP, HOLD and SLOW mean for the lift. [1]
- Treat HOLD and SLOW as continuing signals. They stay on for everyone in the jobsite and clear when the last person leaves. [1]
- For a move controlled by a held button, keep the button pressed while the move is required. If that move stops arriving for 2 seconds, the other phones drop it. [1]
- Use STOP when the crew needs the held directions released. STOP releases every held direction on every phone and puts a full-screen alert on the other phones. [1]
- Use the one-tap calls when a short confirmation is useful. Go Ahead, Copy That and All Clear are sent as chat messages. [1]
- If the crew needs spoken communication, anyone who joins can take part in a voice call from the phone browser. [1]
- At the end of the work period, have everyone leave the jobsite, and remember that an empty jobsite is wiped after 3 idle hours. [1]
Tools that can do it
OperatorLink is made by the team that publishes this site. It puts STOP, HOLD and SLOW on the jobsite crew's phones and passes button presses, chat and voice between phones in a browser. [1] [1] It runs in a phone browser without an app install. [1] The person who starts a jobsite shares a link or QR code for the crew to join. [1]
A phone video call app is another option to consider. No facts here describe one, so check how its call works during the lift and what the crew needs to do to keep communication available.
A two-way radio is another option to consider. No facts here describe one, so check how the crew will use it for the required lift communication.
For any browser-based option, check the phone data signal before the lift.
Common mistakes to avoid
Starting the lift before checking the phones: browser signals pass between phones, so check each phone's browser and data signal before movement begins. [1] Treating STOP, HOLD and SLOW as if they all behave the same: STOP releases held directions, while HOLD and SLOW stay on until the last person leaves. [1] [1] Holding a move button without confirming that the move continues to arrive: if it stops arriving for 2 seconds, the other phones drop it. [1] Forgetting the different alert behavior between Android browsers and iPhone Safari: Android browsers make signals such as STOP buzz, while iPhone Safari ignores the buzz. [1] Leaving a jobsite empty and expecting it to remain available: an empty jobsite is wiped after 3 idle hours. [1]
Frequently asked questions
Is OperatorLink free to use?
OperatorLink is currently free to use, and no paid plan is built yet. [1] It runs in a phone browser, so the phone needs a working data signal for the signals to pass between phones. [1] Check the phone's data connection before the lift.
What happens when the STOP button is pressed?
STOP ends every move that is being held down on every phone and shows a full-screen alert to everyone else. [1] HOLD and SLOW remain on for everyone in the jobsite and clear when the last person leaves. [1]
How long does a jobsite link stay active?
A jobsite link stops working 12 hours after the first person joins it. [1] An empty jobsite is wiped after 3 idle hours. [1] For another shift, check the link and start a new jobsite when needed, then share its link or QR code with the crew. [1]
Do STOP signals buzz on every phone?
On Android browsers, signals such as STOP make the phone buzz. [1] iPhone Safari ignores the buzz. [1] Check how the alert appears on each phone before the lift.
Can crew members talk over the phone during a lift?
Anyone who joins the jobsite can take part in a voice call from the phone browser. [1] One-tap calls such as Go Ahead, Copy That and All Clear are sent as chat messages. [1] The browser connection depends on the phone's data signal, so check that connection before the lift. [1]
OperatorLink is currently free to use, and no paid plan is built yet. [1]
Try OperatorLinkSources
Related comparisons
- How to assess crane signal trainees passing calls clearly
- How to assign crane crews to jobs for crane dispatchers in 2026
- How to assign who gives signals during a pick for lift planners
- How MEWP crews call a stop near overhead hazards
- Calling material lifts to upper decks for scaffolding crews
- How to call hold during tight lifts for plant riggers
- How to call hold when a hose shifts under pressure
- Call hold when a load goes out of level
- Call HOLD when a load nears live process equipment
- How to call hold when a load shifts during a lift