2Dig Plain comparisons of crane signalling and jobsite communication tools

Coordinating glass panel lifts with crane and install crew

Steps to coordinate glass panel lifts with the crane operator and installation crew, with what to have ready and common mistakes to avoid.

By 2Dig ยท

2Dig is published by the makers of OperatorLink, which is compared here alongside other tools.

OperatorLink shows STOP, HOLD and SLOW to the jobsite crew on phone browsers, so the crane operator and the installation crew can follow the same signals during a glass panel lift [1]. It is currently free to use [1]. Whichever tool the team picks, agree on the lift plan with the signal person before the first panel moves.

OptionWhat it doesFeeCard fee
OperatorLinkShows STOP, HOLD and SLOW to the crew and passes button presses, chat and voice between phones in a browser [1]Currently free to use, no paid plan built yet [1]not published
Phone video call appnot publishednot publishednot published
Two-way radionot publishednot publishednot published

What you need before you start

Before a glass panel lift starts, the curtain wall project manager needs the lift plan in writing. The plan should cover the route for each panel, the landing point on the floor, and the name of the signal person, who gives the crane operator directions. The crane operator, the installation crew lead and the signal person each need to know who may call a stop.

Each phone that will show the signals needs a working browser and a data signal for the whole shift, because the signals pass between phones in a browser. [1] One person starts the jobsite session and shares a link or QR code with the rest of the crew, and each member joins from it. [1] A link stops working 12 hours after the first person joins it, so a link from an earlier shift may no longer open the session. [1] Decide who will end the lift and clear HOLD and SLOW at the end, since those signals stay on for everyone until the last person leaves. [1]

Step by step

Work through these steps in order on the day of the lift.

  1. Walk the lift with the crane operator, the installation crew lead and the signal person before the first panel moves, and agree on the route, the landing point and who may call a stop.
  2. Check that every phone has a working browser and a data signal for the whole shift. [1]
  3. Have the person who starts the session open it from a phone browser. Nothing needs to be installed. [1]
  4. That person shares the link or QR code with the crew, and each member joins from it. [1]
  5. Confirm every crew member is in the session before the lift begins, so each person sees the same signals. [1]
  6. Agree what HOLD and SLOW mean for this lift, since they stay on for everyone in the jobsite until the last person leaves. [1]
  7. Send each move by holding its move button, and watch the load while the panel travels. Holding a move button keeps sending that move to the other phones, and if it stops arriving for 2 seconds, they drop it. [1]
  8. Use STOP the moment a panel moves in a way nobody expected. STOP releases every held direction on every phone and shows a full-screen alert to everyone else, so pause and look before moving again. [1]
  9. A jobsite with nobody in it is wiped after 3 idle hours. [1]

Tools that can do it

OperatorLink is made by the team that publishes this site. It shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser. [1] [1] The page runs in a phone browser with no app install. [1] One-tap radio-style calls such as Go Ahead, Copy That and All Clear are sent as chat messages. [1] Anyone who joins can take part in a voice call run from the phone browser. [1]

A phone video call app is a second option. No facts here describe one, so check whether the call stays open for the whole lift, whether the signal person stays in view of the crane operator, and whether the phone locks its screen during the lift.

A two-way radio is a third option. No facts here describe one, so check that the crew agrees on plain voice calls, that every member can be heard over the noise of the site, and that the channel stays clear through the lift.

Match the option to the crew and the site, and keep a fallback ready in case a phone loses its data signal.

Common mistakes to avoid

Relying on one phone for STOP is a common error. Keep a voice or hand signal ready as well, and check each phone's signal before the lift. Assuming every phone alerts the same way is another. On Android browsers, signals such as STOP make the phone buzz, while iPhone Safari ignores the buzz, so check the sound and screen on every device before the lift. [1] Leaving a session open overnight and expecting it to hold the signals the next day is also a mistake, because a jobsite with nobody in it is wiped after 3 idle hours. [1] Forgetting that HOLD and SLOW stay on for everyone until the last person leaves can leave the crew acting on an old signal. [1] Not confirming that a move still arrives matters too: if a move stops arriving for 2 seconds, the other phones drop it. [1] Letting a phone go to sleep during the lift is a risk. The page can be added to the phone's home screen as a standalone app, and the screen settings still need checking before the shift. [1] Starting the lift before the plan is agreed with the crane operator and the installation crew is the mistake that causes the most trouble of all.

Frequently asked questions

Is OperatorLink free to use on a curtain wall project?

OperatorLink is currently free to use, and no paid plan is built yet. [1] It shows STOP, HOLD and SLOW to the crew and passes button presses, chat and voice between phones in a browser. [1] A glass panel lift still depends on each phone's data signal, so check the signal for the whole shift before relying on it on the day. When comparing any other option, look at the same points: what it costs, how the crew joins, and what happens when a phone drops out.

What happens when STOP is pressed during a glass panel lift?

STOP releases every held direction on every phone in the session and shows a full-screen alert to everyone else. [1] HOLD and SLOW behave differently, because they stay on for everyone until the last person leaves the jobsite. [1] On the day, the crew should agree that any person may call STOP when a panel moves unsafely, and then check the lift plan with the signal person before moving again.

How long does a jobsite link for a lift stay active?

A jobsite link stops working 12 hours after the first person joins it. [1] A jobsite with nobody in it is wiped after 3 idle hours. [1] The person who starts a jobsite shares a link or QR code, and the crew joins from it. [1]

Do STOP signals buzz every phone on a jobsite?

On Android browsers, signals such as STOP make the phone buzz, while iPhone Safari ignores the buzz. [1] Check the sound and screen settings on every phone in the crew before the lift, and keep a voice or hand signal as a backup in case a phone misses an alert.

Can OperatorLink send Go Ahead and All Clear calls during a lift?

One-tap radio-style calls such as Go Ahead, Copy That and All Clear are sent as chat messages. [1] Anyone who joins the session can also take part in a voice call run from the phone browser. [1] Agree on which calls the crew will use before the first panel moves, so each member knows what to expect.

OperatorLink is currently free to use, and no paid plan is built yet. [1]

Try OperatorLink

Sources

  1. OperatorLink's own description of itself (the product of this site's publisher)

Related comparisons