How to coordinate crane picks of cut structural pieces
Building demolition supervisors can coordinate crane picks of cut structural pieces through a shared phone browser session. Steps, options and mistakes.
2Dig is published by the makers of OperatorLink, which is compared here alongside other tools.
Building demolition supervisors can keep the crane operator and the signal crew working from the same signals on each pick of a cut structural piece. A shared jobsite session opens in a phone browser, and the crew joins from a link or QR code that someone shares. [1] [1] STOP reaches everyone else as a full-screen alert, while HOLD and SLOW stay on until the last person leaves. [1] [1]
| Option | What it does | Fee | Card fee |
|---|---|---|---|
| OperatorLink | Shows STOP, HOLD and SLOW to the crew and passes button presses, chat and voice between phones in a browser [1] | Currently free to use, no paid plan built yet [1] | not published |
| Phone video call app | not published | not published | not published |
| Two-way radio | not published | not published | not published |
What you need before you start
Before any pick begins, every member of the crew should have a phone with a browser and a steady data connection, since the signals move between phones over that connection. [1] One person opens the jobsite session and sends the link or QR code to the others, so each member joins from the same place. [1] Sessions also have timers. A link stops working 12 hours after the first person joins, and a jobsite with nobody in it is cleared after 3 idle hours, so a session from an earlier day should be opened fresh. [1] [1] Decide in advance whose phone shows HOLD and SLOW, because those two stay on for everyone until the last person leaves the jobsite. [1] Agree too on who may press STOP, since it releases every held direction on every phone. [1] Add the page to each phone's home screen before the lift, because it can run there as a standalone app. [1] Finally, confirm each phone's data plan covers the full shift, because voice and signals both depend on that connection.
Step by step
- Confirm every phone has a browser and a steady data connection before the crew moves under load. [1]
- Open the session from a phone browser. Nobody needs to install an app first. [1]
- Share the link or QR code, and have each crew member join from it. [1]
- Before the first cut piece leaves the ground, make sure each person can see the same signals on their screen. [1]
- Plan for HOLD and SLOW to stay up through the pick, since they remain on for everyone until the last person leaves. [1]
- Holding a move button keeps that move going to the other phones. If the move stops arriving for 2 seconds, the other phones drop it, so keep the button held for the whole move. [1]
- When STOP is pressed, every held direction is released on every phone and everyone else sees a full-screen alert, so the crew should stop and confirm before moving again. [1]
- Use the one-tap calls Go Ahead, Copy That and All Clear for short updates during the pick. They go out as chat messages. [1]
- For back-and-forth talk between the crane operator and the signal person, anyone who has joined can take part in a voice call run from the phone browser. [1]
- When the shift ends, everyone leaves the session. A jobsite left with nobody in it is cleared after 3 idle hours. [1]
Tools that can do it
OperatorLink shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser. [1] [1] It runs in the browser with no app install, and it can be added to a home screen as a standalone app. [1] [1] It is currently free to use, and no paid plan is built yet. [1]
A phone video call app is a second option. No facts are on hand for it here, so check whether the crew can keep the call open for the whole shift, whether the signal person stays in view of the crane operator, and whether the phone's screen stays on during the lift.
A two-way radio is a third option. No facts are on hand for it here, so check that every member can hear the channel over the noise on site, that the crew agrees on plain wording, and that the channel stays clear through the lift.
Pick the option that suits the crew and the site, and keep a fallback ready for the lift.
| Option | What it does | Fee | Card fee | |---|---|---|---| | OperatorLink | Shows STOP, HOLD and SLOW to the crew and passes button presses, chat and voice between phones in a browser [1] | Currently free to use, no paid plan built yet [1] | not published | | Phone video call app | not published | not published | not published | | Two-way radio | not published | not published | not published |
Common mistakes to avoid
Relying on a single phone for STOP. If that phone drops off its data connection, the signal may not reach the crew in time, so keep a voice or hand signal ready as a backup.
Assuming every phone alerts the same way. On Android browsers, signals such as STOP make the phone buzz, but iPhone Safari ignores the buzz, so test the sound and screen on each device before the lift. [1]
Reusing a link from an earlier shift. A jobsite link stops working 12 hours after the first person joins it, so open a fresh session for each new shift. [1]
Forgetting that HOLD and SLOW persist. They stay on for everyone until the last person leaves, so a crew that believes it has cleared them may still be working to an old instruction. [1]
Letting a move go quiet. A held move that stops arriving for 2 seconds is dropped by the other phones, so keep the button down through the whole move and watch for a stalled signal. [1]
Letting the phone sleep during the lift. Adding the page to the home screen gives a standalone app icon to tap back into the session quickly. [1]
Expecting an empty session to wait for the crew. A jobsite with nobody in it is cleared after 3 idle hours, so a crew that steps away for a long break should expect to rejoin a fresh session. [1]
Frequently asked questions
Is OperatorLink free to use for crane picks?
OperatorLink is currently free to use, and no paid plan is built yet. [1] It runs in a phone browser, so there is no app to install before the pick. [1] Each phone still needs a working data connection for the whole shift, so check the phone's data plan before relying on the session for a lift.
What happens when STOP is pressed during a pick?
STOP stops every move on every phone in the session and shows a full-screen alert to everyone else. [1] HOLD and SLOW behave differently, because they remain on for everyone until the last person leaves the jobsite. [1] Agree on that difference before the first lift, so each member knows which signals stay up through the pick.
How long does a jobsite link keep working?
A jobsite link stops working 12 hours after the first person joins it. [1] A jobsite with nobody in it is cleared after 3 idle hours. [1] For a new shift, open a fresh session and share the new link or QR code with the crew, rather than reusing an old link from an earlier day. [1]
Do STOP signals make every phone buzz?
On Android browsers, signals such as STOP make the phone buzz. [1] iPhone Safari ignores the buzz, so an iPhone may only show the alert on screen. [1] Check the sound and screen settings on every phone before the lift, so no crew member depends on a buzz that will not come.
Can OperatorLink run voice calls during a crane pick?
Anyone who joins the jobsite can take part in a voice call run from the phone browser. [1] One-tap calls such as Go Ahead, Copy That and All Clear go out as chat messages. [1] Because voice runs in the browser, keep a radio or hand signal ready as a backup for when the phone connection is weak.
OperatorLink is currently free to use, and no paid plan is built yet. [1]
Try OperatorLinkSources
Related comparisons
- How to assess crane signal trainees passing calls clearly
- How to assign crane crews to jobs for crane dispatchers in 2026
- How to assign who gives signals during a pick for lift planners
- How MEWP crews call a stop near overhead hazards
- Calling material lifts to upper decks for scaffolding crews
- How to call hold during tight lifts for plant riggers
- How to call hold when a hose shifts under pressure
- Call hold when a load goes out of level
- Call HOLD when a load nears live process equipment
- How to call hold when a load shifts during a lift