How to coordinate branch and trunk lifts with a crane operator
Steps for tree removal crews to coordinate branch and trunk lifts with the crane operator, the tool options, and common mistakes to avoid.
2Dig is published by the makers of OperatorLink, which is compared here alongside other tools.
Crews choose their signal method from several options, and OperatorLink is one of them, covered below.
| Option | What it does | Fee |
|---|---|---|
| OperatorLink | Shows STOP, HOLD and SLOW to the crew and passes button presses, chat and voice between phones in a phone browser [1] | Currently free to use, no paid plan built yet [1] |
| Phone video call app | not published | not published |
| Two-way radio | not published | not published |
What you need before you start
Before the first branch comes down, the crew needs one signal person who has a clear sight line to the crane operator and to the load. Everyone else on the ground should know that person is the only one giving signals, so the operator never receives two instructions at once. The crew also needs to agree on what each signal means, such as stop, hold and slow, and every member should be able to say those words back.
Walk the drop zone before the lift and mark where each branch and trunk section will land. The crew should know the clear area and where each person stands while a piece is in the air. Check that the operator and the signal person can each see the load, and agree on what the crew does if that view is lost.
Keep a backup way to pass the same signals ready in case the main method fails. Make sure every worker has been briefed on the plan, and hold a short talk before the lift in which each person repeats their role.
Step by step
- Hold a short plan talk with the crane operator, the signal person and the crew leader before the first cut.
- Agree on the order of the branch and trunk pieces and which piece comes off first.
- Confirm the signal person has a clear view of the load and the landing spot.
- Agree on the words for each signal, and have each person repeat them back.
- Set the clear zone and check that nobody stands under the load or in the fall path.
- Give a test signal before the first lift and confirm the operator responds to it.
- Start each lift with a slow pick so the piece clears the rest of the tree.
- Move the load only on the signal person's instruction, and give stop as soon as the load moves off plan.
- Lower the piece to the landing spot and confirm it is set before releasing the rigging.
- Between pieces, pause, check the sight line again, and repeat the signals.
- At the end of the job, debrief with the crew and note any signal that was missed or unclear.
Tools that can do it
OperatorLink is made by the team that publishes this site. It shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser. [1] [1] Nobody needs to install an app, because the page runs in the browser. [1] The person who starts a jobsite shares a link or QR code, and the crew joins from it. [1] While the move button is held, it keeps sending its move to the other phones, and if that move stops arriving for 2 seconds, the other phones drop it. [1] STOP releases every held direction on every phone and shows a full-screen alert to everyone else. [1] One-tap radio-style calls such as Go Ahead, Copy That and All Clear are sent as chat messages. [1]
A phone video call app is another option to check for the crew. Check whether the call can stay open for the whole job, whether the signal person can keep the load in view while on the call, and whether the phone's screen stays on during a lift.
A two-way radio is another option to check for the crew. Check that every crew member can hear the calls over the noise of the saw and the machine, and that the channel stays clear during the lift.
Match the option to the crew and the site, and keep a backup signal method ready in every case.
Common mistakes to avoid
Giving signals from more than one person. The operator then gets conflicting instructions, so name one signal person and make that clear to the whole crew.
Relying on a single phone or radio with no backup. If that channel drops during a lift, the crew should already know the fallback method.
Checking that each phone alerts the crew the same way. On Android browsers, signals such as STOP make the phone buzz, while iPhone Safari ignores the buzz, so check the sound and screen on every device. [1]
Leaving a session open and expecting it to hold the signals the next day. A jobsite with nobody in it is wiped after 3 idle hours, so start a fresh session for the next day. [1]
Forgetting that HOLD and SLOW stay on for everyone until the last person leaves, so the crew has to clear them on purpose. [1]
Sharing an old link. A jobsite link stops working, so share the current link or QR code with each new crew member. A jobsite link stops working 12 hours after the first person joins it, so share the current link or QR code with each new crew member. [1]
Frequently asked questions
Is OperatorLink free to use?
OperatorLink is currently free to use, and no paid plan is built yet. [1] Button presses, chat and voice pass between phones in a browser. [1] Before the job, check that each phone has a working signal for the whole shift. Keep a backup signal method on site as well, so the crew is not waiting on one connection during a lift. Confirm the setup with the crew before the first branch comes down, so nobody is learning the tool mid-lift.
What happens when STOP is pressed in OperatorLink?
STOP releases every held direction on every phone in the session and shows a full-screen alert to everyone else. [1] HOLD and SLOW behave differently, because they stay on for everyone until the last person leaves the jobsite. [1] After a STOP, the crew should look at the load and confirm the situation before any movement starts again, and the signal person should give the next instruction clearly.
How long does an OperatorLink jobsite link stay active?
A jobsite link stops working 12 hours after the first person joins it. [1] A jobsite with nobody in it is wiped after 3 idle hours. [1] For a new day, start a new session and share the new link or QR code with the crew, so everyone is working from the same jobsite and nobody is holding an expired link.
Do OperatorLink signals buzz on every phone?
On Android browsers, signals such as STOP make the phone buzz. [1] iPhone Safari ignores the buzz. [1] Check the sound and screen settings on every phone before the lift, and agree with the crew on a backup signal in case a phone misses an alert.
Can crew members talk during a lift with OperatorLink?
Anyone who joins the jobsite can take part in a voice call run from the phone browser. [1] One-tap calls such as Go Ahead, Copy That and All Clear are sent as chat messages. [1]
OperatorLink is currently free to use, and no paid plan is built yet. [1]
Try OperatorLinkSources
Related comparisons
- How to assess crane signal trainees passing calls clearly
- How to assign crane crews to jobs for crane dispatchers in 2026
- How to assign who gives signals during a pick for lift planners
- How MEWP crews call a stop near overhead hazards
- Calling material lifts to upper decks for scaffolding crews
- How to call hold during tight lifts for plant riggers
- How to call hold when a hose shifts under pressure
- Call hold when a load goes out of level
- Call HOLD when a load nears live process equipment
- How to call hold when a load shifts during a lift