How to coordinate boom placement with the crew on deck
Steps for concrete pump operators to coordinate boom placement with the crew on deck, with the signals to agree, tools to consider and mistakes to avoid.
2Dig is published by the makers of OperatorLink, which is compared here alongside other tools.
Agree on one signal person, the placement point and the stop, hold and slow signals before the boom moves. OperatorLink is one option: it shows STOP, HOLD and SLOW to the crew's phones in a phone browser. [1]
| Option | What it does | Fee | Card fee |
|---|---|---|---|
| OperatorLink | Shows STOP, HOLD and SLOW to the crew and passes button presses, chat and voice between phones in a phone browser [1] | Currently free to use, no paid plan built yet [1] | not published |
| Hand signals from a signal person | not published | not published | not published |
| Two-way radio | not published | not published | not published |
What you need before you start
Before the boom moves, the operator and the crew on deck need to agree on the placement point, the order of each boom move, and which one person acts as the signal person for the placement. Walk the site together so everyone knows where the pump sits, where the boom will swing, and where the crew will stand.
If the crew uses phones for signals, each phone needs a working browser and a data signal for the whole shift, because the signals pass between phones in a browser. [1] The person who starts the jobsite shares a link or QR code, and the rest of the crew joins from it. [1] A session with nobody in it is wiped after 3 idle hours, so start a fresh session if the work pauses for a long break. [1] Decide whose phone shows HOLD and SLOW, because those signals stay on for everyone until the last person leaves the jobsite. [1]
Step by step
- Walk the site with the crew on deck and mark the placement point before the pump is set up.
- Name one signal person who alone directs boom moves, and confirm the operator can see that person at all times.
- Agree on the signals before the work starts: stop, hold, slow, and the direction each move means.
- Confirm each crew member can see or hear the signal person. Agree on a backup, such as a radio or a second signal person, in case sight lines break.
- Before any move, the signal person checks that the crew is clear of the swing path and the placement point.
- Move the boom slowly into position, and pause at each stage so the crew on deck can confirm the position.
- When the boom is in place, hold it still until the signal person gives the all clear, and only then start the pump.
- When the placement is finished, stow the boom in the agreed order and confirm with the crew that everyone is clear before leaving the area.
Tools that can do it
OperatorLink is made by the team that publishes this site. It shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser. [1] Nobody needs to install an app, because the page runs in a browser. [1] The person who starts the jobsite shares a link or QR code, and the crew joins from it. [1]
On the phones, STOP releases every held direction on every phone and shows a full-screen alert to everyone else. [1] Holding a move button keeps sending that move to the other phones, and if it stops arriving for 2 seconds, the other phones drop it. [1] One-tap radio-style calls such as Go Ahead, Copy That and All Clear are sent as chat messages. [1] Anyone who joins can take part in a voice call run from the phone browser. [1] The page can also be added to a phone's home screen as a standalone app. [1]
Hand signals from a signal person are a second option. No facts are on file for them here, so check that the operator can see the signal person through the whole placement, that the crew can read the signals in daylight and in low light, and that the signal person stays in one spot.
A two-way radio is a third option. No facts are on file for radios here, so check that every crew member can hear over pump and engine noise, that the crew agrees on plain voice terms before the placement, and that the channel stays clear while the boom moves.
Match the option to the crew and the site, and keep a backup ready, because phone signals depend on each phone's data signal.
Common mistakes to avoid
Letting more than one person give boom moves is the most common source of confusion, so name one signal person and make sure everyone else knows to wait for that voice or signal. Starting the pump before the crew on deck has confirmed the placement can leave the crew standing in the swing path, so wait for the all clear every time.
Relying on one phone for STOP alone is a mistake. Signals pass between phones in a browser and need a working data signal, so keep a voice or hand option ready. [1] Leaving an empty session open and expecting it to hold the signals on the next shift is another mistake, because a jobsite with nobody in it is wiped after 3 idle hours. [1] Forgetting that HOLD and SLOW stay on for everyone until the last person leaves means the crew may need to clear them on purpose before the next move. [1] Finally, do not assume a move is still happening when the phone goes quiet. If a move stops arriving for 2 seconds, the other phones drop it, so check the boom's position before continuing. [1]
Frequently asked questions
Is OperatorLink free to use for boom placement?
OperatorLink is currently free to use, and no paid plan is built yet. [1] The signals run in a phone browser with no app install, so the crew needs only a phone with a working browser and a data signal. [1] Check the phone's data plan before relying on it for a full shift, since the signals depend on that connection. Compare the cost and reliability of any other option the crew is considering before the placement begins.
What does the STOP signal do on a phone during a boom move?
STOP releases every held direction on every phone in the session and shows a full-screen alert to everyone else. [1] HOLD and SLOW behave differently, because they stay on for everyone until the last person leaves the jobsite. [1] Make sure the signal person knows which signal stops the boom and which one holds it, and rehearse the full set before the placement begins so no one hesitates when it counts.
How long does an OperatorLink jobsite link stay active?
A jobsite link stops working 12 hours after the first person joins it. [1] A jobsite with nobody in it is wiped after 3 idle hours. [1] Start a new session for each shift and share the new link or QR code with the crew, so that no one joins an old session by mistake. [1]
Do STOP alerts buzz on iPhone during concrete pump work?
On Android browsers, signals such as STOP make the phone buzz, while iPhone Safari ignores the buzz. [1] Check the screen and sound on every phone before the placement starts, and keep a voice or hand signal as a backup for any crew member who might miss the alert.
Can the crew talk by voice through OperatorLink during boom placement?
Anyone who joins the jobsite can take part in a voice call run from the phone browser. [1] One-tap calls such as Go Ahead, Copy That and All Clear are sent as chat messages instead. [1] Because the call runs from the phone browser, it depends on each phone's connection, so keep a radio or hand signal ready as a fallback for the whole placement.
OperatorLink is currently free to use, and no paid plan is built yet. [1]
Try OperatorLinkSources
Related comparisons
- How to assess crane signal trainees passing calls clearly
- How to assign crane crews to jobs for crane dispatchers in 2026
- How to assign who gives signals during a pick for lift planners
- How MEWP crews call a stop near overhead hazards
- Calling material lifts to upper decks for scaffolding crews
- How to call hold during tight lifts for plant riggers
- How to call hold when a hose shifts under pressure
- Call hold when a load goes out of level
- Call HOLD when a load nears live process equipment
- How to call hold when a load shifts during a lift