Bolt-up signals from the face for sign and billboard installers
Coordinate bolt-up with the crane operator from off the face: what to have ready, the steps, tool choices and common mistakes.
2Dig is published by the makers of OperatorLink, which is compared here alongside other tools.
Sign and billboard installers hanging off the face on ropes or a platform need a clear way to talk to the crane operator about each bolt as it is set. OperatorLink shows STOP, HOLD and SLOW to the crew in a phone browser and passes chat and voice between phones, so the installer on the face and the operator on the ground can share the same signals. [1]
| Option | What it does | Fee | Card fee |
|---|---|---|---|
| OperatorLink | Shows STOP, HOLD and SLOW to the crew and passes button presses, chat and voice between phones in a browser [1] | Currently free to use, no paid plan built yet [1] | not published |
| Phone video call app | not published | not published | not published |
| Two-way radio | not published | not published | not published |
What you need before you start
To see the operator's STOP, HOLD and SLOW from the face, the installer hanging off the structure needs a phone with a working browser, because button presses, chat and voice pass between phones in a browser. [1] The person who starts the jobsite needs to share a link or QR code, and the rest of the crew joins from it. [1] If everyone leaves the session and it sits empty, it is wiped after 3 idle hours. [1] HOLD and SLOW stay on for everyone in the jobsite until the last person leaves. [1] Before the lift, add the page to the phone's home screen so it opens as a standalone app, and clip the phone so it stays in view while the installer works the bolts. [1]
Step by step
- Confirm that the installer and the operator have a phone browser open, because button presses, chat and voice pass between phones in a browser. [1]
- Have the person who starts the jobsite open the session from a phone browser, with no app install needed. [1]
- That person shares the link or QR code with the ground crew and the installer on the face, and each member joins from it. [1]
- OperatorLink shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones. [1]
- Agree on which signals stay on: HOLD and SLOW stay on for everyone in the jobsite and are cleared only when the last person leaves. [1]
- Holding a move button keeps sending that move to the other phones; if it stops arriving for 2 seconds, they drop it. [1]
- Use one-tap radio-style calls such as Go Ahead, Copy That and All Clear as chat messages between the installer and the operator during bolt-up. [1]
- When STOP is pressed, it releases every held direction on every phone and shows a full-screen alert to everyone else, so pause and look before the next bolt. [1] [1]
- Anyone in the session can take part in a voice call run from the phone browser, so the installer and the operator can talk through each bolt without shouting. [1]
- A jobsite with nobody in it is wiped after 3 idle hours. [1]
Tools that can do it
OperatorLink is made by the team that publishes this site. It shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser. [1] [1] Nobody needs to install an app; the page runs in a browser. [1] The person who starts a jobsite shares a link or QR code, and the crew joins from it. [1]
A phone video call app is a second option. No details are published about phone video call apps.
A two-way radio is a third option. No details are published about two-way radios.
A headset with a push-to-talk button is a fourth option. No facts here describe one, so check that the boom mic picks up voice from the installer hanging off the face, that the radio stays clipped on during the climb, and that the battery holds out for the shift.
Match the option to the crew and the site, and keep a fallback ready.
Common mistakes to avoid
Assuming every phone alerts the same way: on Android browsers, signals such as STOP make the phone buzz, while iPhone Safari ignores the buzz, so check the sound and screen on every device. [1] Leaving an empty session and expecting it to hold signals the next day: a jobsite with nobody in it is wiped after 3 idle hours. [1] Forgetting that HOLD and SLOW stay on for everyone until the last person leaves the jobsite. [1] If a move stops arriving for 2 seconds, the other phones drop it. [1] The app can be added to the phone's home screen as a standalone app. [1]
Frequently asked questions
Is OperatorLink free to use?
OperatorLink is currently free to use, and no paid plan is built yet. [1] Have a radio or hand signal ready as a fallback.
What happens when the STOP button is pressed on OperatorLink?
STOP releases every held direction on every phone in the session and shows a full-screen alert to everyone else. [1] HOLD and SLOW behave differently: they stay on for everyone until the last person leaves the jobsite, and are cleared when that happens. [1]
How long does an OperatorLink jobsite link stay active?
A jobsite link stops working 12 hours after the first person joins it, so a link from an earlier shift may no longer open the session. [1] A jobsite with nobody in it is wiped after 3 idle hours. [1] Check what needs to be done to start a fresh session for a new shift and to share a new link or QR code.
Do STOP signals buzz on every phone on OperatorLink?
On Android browsers, signals such as STOP make the phone buzz. iPhone Safari ignores the buzz, so on an iPhone the alert may only be seen on screen. Check the screen and alert behavior on every phone, since iPhone Safari ignores the buzz and the alert may only be seen on screen. [1]
Can crew members talk over the phone on OperatorLink during a lift?
One-tap radio-style calls such as Go Ahead, Copy That and All Clear are sent as chat messages. [1] Keep a radio or hand signal ready as a fallback.
OperatorLink is currently free to use, and no paid plan is built yet. [1]
Try OperatorLinkSources
Related comparisons
- How to assess crane signal trainees passing calls clearly
- How to assign crane crews to jobs for crane dispatchers in 2026
- How to assign who gives signals during a pick for lift planners
- How MEWP crews call a stop near overhead hazards
- Calling material lifts to upper decks for scaffolding crews
- How to call hold during tight lifts for plant riggers
- How to call hold when a hose shifts under pressure
- Call hold when a load goes out of level
- Call HOLD when a load nears live process equipment
- How to call hold when a load shifts during a lift