How to coordinate beam lifts with the crane operator
Steps for steel erectors to coordinate beam lifts with the crane operator: what to have ready, signals, tool options and common mistakes.
2Dig is published by the makers of OperatorLink, which is compared here alongside other tools.
Start one OperatorLink jobsite session in a phone browser, share the link or QR code with the crew, and agree on how STOP, HOLD and SLOW will be used before the first lift. [1] [1] STOP shows a full-screen alert to everyone else, and HOLD and SLOW stay on until the last person leaves. [1] [1]
| Option | What it does | Fee | Card fee |
|---|---|---|---|
| OperatorLink | Shows STOP, HOLD and SLOW to the crew and passes button presses, chat and voice between phones in a phone browser [1] | Currently free to use, no paid plan built yet [1] | not published |
| Phone video call app | not published | not published | not published |
| Two-way radio | not published | not published | not published |
What you need before you start
Steel erectors and the crane operator need an agreed way to confirm each beam lift before the load leaves the ground. Before the first lift, agree on who gives each signal, what STOP, HOLD and SLOW each mean on this job, and what the crew does if the crane operator cannot see the load. Each person who needs the signals needs a phone with a working browser and a data signal, because the signals are passed between phones in a browser. [1] The person who starts the jobsite shares a link or QR code, and the crew joins from it. [1] A jobsite with nobody in it is wiped after 3 idle hours, so start a fresh session at the beginning of each shift. [1] Check that every crew member can hear the others over site noise, and keep a backup signal method ready in case a phone drops out.
Step by step
- Check that each phone has a working browser and a data signal for the whole shift. [1]
- Have the person who starts the jobsite open the session from a phone browser. No app install is needed. [1]
- That person shares the link or QR code with the steel erectors and the crane operator, and each person joins from it. [1]
- Confirm that everyone is in the session before the first lift, so everyone sees the same signals. [1]
- Agree on which signals stay on. HOLD and SLOW stay on for everyone in the jobsite and are cleared only when the last person leaves. [1]
- Agree on one signal person for each lift, and make sure that person can see the load and the crane operator at the same time.
- For each move, keep the move button held while the load moves. Holding a move button keeps sending that move to the other phones, and if it stops arriving for 2 seconds, the other phones drop it. [1]
- If anything looks wrong, press STOP, then pause and look before moving again. STOP releases every held direction on every phone and shows a full-screen alert to everyone else. [1]
- Use quick replies such as Go Ahead, Copy That and All Clear to confirm each step, since these are sent as one-tap chat messages. [1]
- At the end of the shift, everyone leaves the session. A jobsite with nobody in it is wiped after 3 idle hours. [1]
Tools that can do it
OperatorLink shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser. [1] [1] It runs in a phone browser with no app install, and the page can be added to a phone's home screen as a standalone app. [1] [1] Anyone who joins the jobsite can take part in a voice call run from the phone browser. [1] A jobsite link stops working 12 hours after the first person joins it, so share a fresh link for each shift. [1]
A phone video call app is a second option. No facts are available here about how one works, so check whether the crew can keep the call open for the whole shift, whether the signal person's hands stay in view, and whether the phone locks its screen during a lift.
A two-way radio is a third option. No facts are available here about one, so check that the crew agrees on plain voice calls, that each member can be heard over site noise, and that the channel stays clear through the lift.
Match the option to the crew and the site, and keep a fallback ready, since the browser option depends on each phone's data signal. [1]
Common mistakes to avoid
Relying on one phone for STOP: if that phone loses its data signal, it cannot send signals to the others, so keep a voice or hand signal ready. [1] Assuming every phone alerts the same way: on Android browsers, signals such as STOP make the phone buzz, while iPhone Safari ignores the buzz, so check the sound and screen on every device. [1] Forgetting that HOLD and SLOW stay on for everyone until the last person leaves, so the crew has to clear them on purpose. [1] Letting a move continue after the button is released: if a move stops arriving for 2 seconds, the other phones drop it. [1] Reusing an old link from a previous shift, since a jobsite link stops working 12 hours after the first person joins. [1] Letting a phone sleep during a lift, so keep the screen awake on the phones the crew depends on.
Frequently asked questions
Is OperatorLink free to use?
OperatorLink is currently free to use, and no paid plan is built yet. [1] Because it runs in a phone browser, each phone still needs a working data signal for the whole shift, so check the phone's data plan before relying on it. [1] Nothing on this page describes a future plan, so check the current price before planning a budget around it.
What happens when the STOP button is pressed in OperatorLink?
STOP releases every held direction on every phone in the session and shows a full-screen alert to everyone else, so the crew sees it straight away. [1] HOLD and SLOW behave differently: they stay on for everyone until the last person leaves the jobsite. [1] After a STOP, confirm that the crew is ready before anyone moves the beam again.
How long does an OperatorLink jobsite link stay active?
A jobsite link stops working 12 hours after the first person joins it. [1] A jobsite with nobody in it is wiped after 3 idle hours, so start a new session at the beginning of each shift. [1] Share the new link or QR code with the steel erectors and the crane operator so that everyone joins the same session.
Do STOP signals buzz every phone in OperatorLink?
On Android browsers, signals such as STOP make the phone buzz. [1] iPhone Safari ignores the buzz, so on an iPhone the crew should rely on the screen and sound instead. [1] Check the sound and screen settings on every phone before the lift so that nobody misses a signal.
Can OperatorLink be used for voice calls during a lift?
Anyone who joins the jobsite can take part in a voice call run from the phone browser. [1] One-tap calls such as Go Ahead, Copy That and All Clear are sent as chat messages. [1] Voice depends on each phone's data signal, so keep a radio or hand signal as a fallback for any lift where the signal may be weak. [1]
OperatorLink is currently free to use, and no paid plan is built yet. [1]
Try OperatorLinkSources
Related comparisons
- How to assess crane signal trainees passing calls clearly
- How to assign crane crews to jobs for crane dispatchers in 2026
- How to assign who gives signals during a pick for lift planners
- How MEWP crews call a stop near overhead hazards
- Calling material lifts to upper decks for scaffolding crews
- How to call hold during tight lifts for plant riggers
- How to call hold when a hose shifts under pressure
- Call hold when a load goes out of level
- Call HOLD when a load nears live process equipment
- How to call hold when a load shifts during a lift