How to confirm clearances for lifts near active nuclear systems
Confirming clearances before lowering heavy components near active nuclear systems. What to have ready, the steps, tool choices and common mistakes.
2Dig is published by the makers of OperatorLink, which is compared here alongside other tools.
A heavy component should only be lowered once the landing area and the load path are confirmed clear of people and equipment near the active systems. The spotter calls out the way is clear, the operator copies the message back, and a fallback keeps the crew in touch if a phone or its data signal drops. OperatorLink shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser. [1] [1] The person who starts a jobsite shares a link or QR code, and the crew joins from it. [1] A phone needs a working data signal, iPhone Safari does not buzz on alert, and an idle jobsite is wiped after 3 idle hours. [1] [1]
| Option | What it does | Fee | Card fee |
|---|---|---|---|
| OperatorLink | Shows STOP, HOLD and SLOW to the crew and passes button presses, chat and voice between phones in a browser [1] | Currently free to use, no paid plan built yet [1] | not published |
| Phone video call app | not published | not published | not published |
| Two-way radio | not published | not published | not published |
What you need before you start
Confirming a clearance before lowering a heavy component near an active system starts with the lift plan and the sign-offs on it. Have the plan that names the component, where it lands, and who approved the move, so the crew knows what the clearance covers. Identify the active systems closest to the landing spot, meaning lines and equipment that stay in service during the lift, and treat each one as a no-go for people and tools. Walk the load path from the pick point to the landing spot before the crane lifts, so the drop zone is empty of people and obstructions. Choose one spotter who can see both the landing spot and the operator, and agree on the exact words for stop and for the way is clear. If the crew talks through a phone browser during the lift, each phone needs a working data signal for the whole shift, because the messages pass between phones over the phone network. [1] Decide whose phone shows HOLD and SLOW, because those two signals stay on for everyone until the last person leaves the jobsite. [1]
Step by step
- Confirm the lift plan names the component, its landing spot, and the person who signed off the move, and hold that confirmation before the crane takes any load. 2. Identify the active systems near the landing spot, meaning lines and equipment that stay in service, and confirm with the person who controls each one that the clearance covers the time of the lift. 3. Walk the full load path from the pick point to the landing spot, and clear it of people, tools, and anything the component could hit on the way down. 4. Check the landing spot is level, can take the component's weight, and is empty of people and equipment when the load arrives. 5. Put a single spotter where they can see both the landing spot and the operator, and keep that view for the whole lower. 6. Agree on the exact words for stop and for the way is clear before the move, and have each crew member repeat them back. 7. Just before lowering, have the spotter say out loud that nobody is under the load and the path is clear, then wait for the operator to copy the message back before any movement. 8. Lower in short, controlled moves, and have the spotter re-check that the space stays clear until the component is set and the load line goes slack. 9. After a pause, confirm the clearance again before resuming, because the space around the landing spot can change while the crew waits. 10. If the crew keeps in touch over a phone, confirm every phone has a data signal for the shift and that the messages are being heard before the lift, and keep a hand or voice fallback ready in case the signal drops.
Tools that can do it
OperatorLink is made by the team that publishes this site. It shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser. [1] [1] Nobody needs to install an app; the page runs in a browser. [1] The person who starts a jobsite shares a link or QR code, and the crew joins from it. [1] One-tap radio-style calls such as Go Ahead, Copy That and All Clear are sent as chat messages, so the spotter can send an All Clear before the component is lowered. [1] Anyone who joins can take part in a voice call run from the phone browser. [1] A jobsite link stops working 12 hours after the first person joins it, and a jobsite with nobody in it is wiped after 3 idle hours. [1] [1]
A phone video call app is a second option. No facts here describe one, so check whether the crew can keep the call open for the whole shift, whether the signal person's hands stay in view, and whether the phone locks its screen mid-lift.
A two-way radio is a third option. No facts here describe one, so check that the crew agrees on plain voice, that every member can be heard over machine noise, and that the channel stays clear through the lift.
Match the option to the crew and the site, and keep a fallback ready since signals in a phone browser depend on the phone's data signal.
Common mistakes to avoid
Relying on a single point of communication during the lower: if that phone's data signal drops, the rest of the crew may not hear the clear or stop message, so keep a hand or voice option ready. Assuming every phone alerts the same way: on Android browsers, signals such as STOP make the phone buzz, while iPhone Safari ignores the buzz, so check the sound and screen on every device. [1] Confirming the landing area only once: the space around a heavy component can change between the first check and the actual lower, so re-confirm just before the component moves down. Trusting a clearance that was time-limited: confirm the clearance still covers the current moment of the lift, and re-check if the delay stretched past the agreed window. Forgetting that HOLD and SLOW stay on for everyone in the jobsite and are cleared when the last person leaves. [1] Leaving an empty session and expecting it to hold: a jobsite with nobody in it is wiped after 3 idle hours. [1] Letting the phone go to sleep mid-lift; adding the page to the home screen as a standalone app helps the screen stay available. [1]
Frequently asked questions
Is OperatorLink free to use?
OperatorLink is currently free to use, and no paid plan is built yet. [1] The signal is shown through a phone browser, so the phones still need a working data signal for the shift. [1] Check the phone's data plan before relying on the message, and keep a radio or hand signal ready in case the signal drops.
How does the crew confirm the landing area is clear before lowering?
The spotter who watches the landing spot confirms out loud that nobody is under the load and the path is clear, and the operator copies the message back before the component moves down. One-tap radio-style calls such as Go Ahead, Copy That and All Clear are sent as chat messages. [1] Re-confirm the space just before the lower, because the area can change while the crew waits, and keep a hand or voice option ready.
How long does a jobsite link stay active for the crew?
A jobsite link stops working 12 hours after the first person joins it, so a link opened for an earlier shift may no longer open the session. [1] A jobsite with nobody in it is wiped after 3 idle hours. [1] For a fresh shift, start a new session and share the new link or QR code with the crew.
Does a clearance signal reach every phone in the crew?
On Android browsers, signals such as STOP make the phone buzz, while iPhone Safari ignores the buzz, so on an iPhone the signal may only be seen on screen. [1] STOP releases every held direction on every phone and shows a full-screen alert to everyone else, so the stop reaches the whole crew at once. [1] Check the sound and screen settings on every phone in the crew before the lift so nobody misses the signal.
Can the crew talk over the phone while a component is being lowered?
Anyone who joins the jobsite can take part in a voice call run from the phone browser. [1] One-tap radio-style calls such as Go Ahead, Copy That and All Clear are sent as chat messages. [1] Voice depends on the phone's data signal, so keep a radio or hand signal as a fallback for the lift.
OperatorLink is currently free to use, and no paid plan is built yet. [1]
Try OperatorLinkSources
Related comparisons
- How to assess crane signal trainees passing calls clearly
- How to assign crane crews to jobs for crane dispatchers in 2026
- How to assign who gives signals during a pick for lift planners
- How MEWP crews call a stop near overhead hazards
- Calling material lifts to upper decks for scaffolding crews
- How to call hold during tight lifts for plant riggers
- How to call hold when a hose shifts under pressure
- Call hold when a load goes out of level
- Call HOLD when a load nears live process equipment
- How to call hold when a load shifts during a lift