How to confirm backup contact methods are in place for lifting equipment inspectors
Steps for lifting equipment inspectors to confirm backup contact methods are in place before work starts, with tools and common mistakes to check.
2Dig is published by the makers of OperatorLink, which is compared here alongside other tools.
List the primary and backup contact methods for the inspection, run a live test of each one, and record who answers and how long it took to get through.
| Option | What it does | Fee | Card fee |
|---|---|---|---|
| OperatorLink | Shows STOP, HOLD and SLOW to the crew and passes button presses, chat and voice between phones in a browser [1] | Currently free to use, no paid plan built yet [1] | not published |
| Phone video call app | not published | not published | not published |
| Two-way radio | not published | not published | not published |
What you need before you start
Lifting equipment inspectors need to know which crew members will be using the phones, because OperatorLink shows STOP, HOLD and SLOW to the jobsite crew. [1] Write down each phone number and test it on the phone that will be used on site. [1]
The inspector also needs a written list of the backup method for each contact, such as a second phone number, a group text, or a voice call that runs from a phone browser. [1] Bring the phone fully charged, with a working data signal, since browser contact methods travel over the phone network. [1]
Before the walkaround, agree with the crew on the order of contact, for example signal person first and supervisor second, and write it down where everyone can see it. [1]
Step by step
- List every contact the inspector needs during the lifting equipment check, including the crew who will see the STOP, HOLD and SLOW signals. [1]
- Write the primary contact method and the backup contact method next to each name. [1]
- Run a live test of the primary method and note who answered. [1]
- Run a live test of the backup method and note who answered. [1]
- Record the time each test took and keep the record with the inspection paperwork. [1]
- Ask the crew to confirm that the backup method is one they will carry on site. [1]
- Check the alert behavior on each phone, because Android browsers buzz for signals such as STOP while iPhone Safari does not. [1]
- Review the contact list at the end of the inspection and mark any method that did not get through. [1]
Tools that can do it
OperatorLink is made by the team that publishes this site. It shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser. [1] [1] Nobody needs to install an app; the page runs in a browser. [1] The person who starts a jobsite shares a link or QR code, and the crew joins from it. [1]
A phone video call app is a second option. No facts here describe one, so check whether the crew can keep the call open for the whole shift, whether the signal person's hands stay in view, and whether the phone locks its screen mid-lift.
A two-way radio is a third option. No facts here describe one, so check that the crew agrees on plain voice, that every member can be heard over machine noise, and that the channel stays clear through the lift.
Match the option to the crew and the site, and keep a fallback ready. Confirm the phone's data signal and its browser on each device before relying on it.
Common mistakes to avoid
Keeping a backup contact method that was never checked: confirm with the crew that a voice or hand option is ready before the lift. Assuming every phone alerts the same way: on Android browsers, signals such as STOP make the phone buzz, while iPhone Safari ignores the buzz, so check the sound and screen on every device. [1] Leaving an empty session and expecting it to hold signals the next day: a jobsite with nobody in it is wiped after 3 idle hours. [1] Forgetting that HOLD and SLOW stay on for everyone until the last person leaves, so the crew has to clear them on purpose. [1] Not confirming that a move still arrives: if a move stops arriving for 2 seconds, the other phones drop it. [1] Assuming the page opens the same way on every phone: the app can be added to a phone's home screen as a standalone app. [1]
Frequently asked questions
Is OperatorLink free to use?
OperatorLink is currently free to use, and no paid plan is built yet. [1] The signal is shown through a phone browser, so confirm the phone's data signal before relying on it. Check the phone's data plan and how the signal holds up at the site.
What happens when the STOP button is pressed?
STOP releases every held direction on every phone in the session and shows a full-screen alert to everyone else, so the crew sees it at once. HOLD and SLOW behave differently: they stay on for everyone until the last person leaves the jobsite.
How long does a jobsite link stay active?
A jobsite link stops working 12 hours after the first person joins it, so a link from an earlier shift may no longer open the session. A jobsite with nobody in it is wiped after 3 idle hours. For a fresh shift, start a new session and share the new link or QR code with the crew.
Do STOP signals buzz on every phone?
On Android browsers, signals such as STOP make the phone buzz. iPhone Safari ignores the buzz, so on an iPhone the alert may only be seen on screen. Check the sound and screen settings on every phone in the crew before the lift so nobody misses the signal.
Can crew members talk over the phone during a lift?
Anyone who joins the jobsite can take part in a voice call run from the phone browser. [1] One-tap radio-style calls such as Go Ahead, Copy That and All Clear are sent as chat messages. [1] Confirm voice works on each phone before the lift, and keep a radio or hand signal as a fallback.
OperatorLink is currently free to use, and no paid plan is built yet. [1]
Try OperatorLinkSources
Related comparisons
- How to assess crane signal trainees passing calls clearly
- How to assign crane crews to jobs for crane dispatchers in 2026
- How to assign who gives signals during a pick for lift planners
- How MEWP crews call a stop near overhead hazards
- Calling material lifts to upper decks for scaffolding crews
- How to call hold during tight lifts for plant riggers
- How to call hold when a hose shifts under pressure
- Call hold when a load goes out of level
- Call HOLD when a load nears live process equipment
- How to call hold when a load shifts during a lift