How to check communication backups for critical lifts
A practical check for insurance risk engineers: review backup communication choices, rehearse a changeover and record what needs fixing before a critical lift.
2Dig is published by the makers of OperatorLink, which is compared here alongside other tools.
Check communication backups by asking the crew to demonstrate the planned changeover before the lift, with no load movement during the check. Record who calls for a stop, how each person acknowledges it, which backup is ready and what must happen before work resumes. Review the actual phones, radios or other equipment named in the lift plan, and leave unresolved points visible in the risk review.
| Option | What to review | Own fee | Card fee |
|---|---|---|---|
| OperatorLink | Shows STOP, HOLD and SLOW to the crew and passes button presses, chat and voice between phones in a browser [1] | Currently free to use [1] | not published |
| Phone video call app | Check the actual app, phone positions and changeover procedure | not published | not published |
| Two-way radio | Check the actual equipment, agreed messages and changeover procedure | not published | not published |
What you need before you start
Have the lift plan, the communication arrangements and the names of the people taking part ready for review. Ask the person responsible for the lift to identify the main communication method, the proposed backup and the person who decides when to change over. Keep the check focused on what the crew can demonstrate before load movement begins.
Ask for the equipment that will be used on the day. Include charging arrangements, spare equipment and the instructions the crew will follow if a message is unclear. Mark the intended positions of the operator and signal person, then ask whether the check can take place from those positions without starting the lift.
Prepare a short record with spaces for the planned action, the observed result, the unresolved issue and the person responsible for fixing it. Separate a spoken assurance from a demonstrated result. If access, weather or site activity prevents part of the check, record that limit rather than marking the whole arrangement as checked.
Things to check before you choose: Can the crew reach the backup from the working position? Who confirms that everyone has changed over? What instruction applies while communication is uncertain?
Step by step
- Read the communication part of the lift plan with the person responsible for the lift. Ask that person to point out the main method, the backup and the agreed response to an unclear or missing message. Record any point that needs an answer before the demonstration.
- Ask the crew to name the person giving directions and the person receiving them. Have each participant explain how a stop request is made and acknowledged. Resolve different descriptions through the person responsible for the lift before continuing the check.
- Inspect the proposed backup where the crew intends to keep it. Ask the intended user to reach it and prepare it for use. Check the actual equipment against the equipment named in the plan, and record substitutions for review.
- Arrange a communication demonstration with no load movement. Ask the sender to give an agreed message and the receiver to repeat its meaning. Include a stop request, an unclear message and a request to repeat a message. Record what happened without turning the demonstration into a claim about future performance.
- Rehearse the changeover. Announce a simulated problem with the main method, then ask the crew to follow the planned response. Observe who calls for a stop, who selects the backup and how everyone confirms the change. Do not create an unexpected interruption during an active lift.
- Ask the crew to demonstrate the backup from the intended working positions where practical. Include the people expected to receive instructions. Note any position or condition that could not be checked, and ask the responsible person how that gap will be addressed.
- Review what permits work to resume. Ask who gives permission, how the crew confirms the chosen communication method and what happens if someone cannot acknowledge the message. Put unanswered questions beside the relevant part of the lift plan.
- Close the record with observed results, limits and required actions. Assign each action to a named person and ask for evidence of completion. Keep the communication check alongside the lift review so another risk engineer can see exactly what was demonstrated.
Tools that can do it
OperatorLink is made by the team that publishes this site. It shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser. [1] Nobody needs to install an app; the page runs in a browser. [1] The person who starts a jobsite shares a link or QR code, and the crew joins from it. [1]
For a demonstration involving phones, OperatorLink can show what happens when STOP is pressed: it releases every held direction on every phone and shows a full-screen alert to everyone else. [1] HOLD and SLOW stay on for everyone in the jobsite and are cleared when the last person leaves. [1] Anyone who joins can take part in a voice call run from the phone browser. [1] Ask the crew to demonstrate the chosen messages and explain what each display means before considering this option in the communication arrangements.
No supplied facts describe a phone video call app. Check whether the intended call can remain open, whether the signal person's hands stay in view and what happens when a phone locks its screen. Ask the crew to demonstrate the proposed changeover using the actual app and phones.
For the radio option, check the actual equipment in use, the messages the crew has agreed in advance, and whether each intended participant can hear and acknowledge those messages from the planned position. Ask how the crew selects the channel, checks the equipment and handles an unclear call.
Use the table as a record of published information supplied for this page. For the unnamed options, obtain the details of the actual equipment or service before comparing cost or deciding what to check.
Common mistakes to avoid
Accepting a backup because it appears on a list leaves the demonstration unfinished. Ask the intended user to show the changeover and acknowledge a message. Record whether the equipment was available at the working position or brought over specially for the check.
Treating a successful message as the whole review misses the planned response to uncertainty. Include an unclear message and ask who keeps work stopped while the crew resolves it. Avoid creating that uncertainty during an active lift.
Assuming every phone alerts the same way needs checking: on Android browsers, signals such as STOP make the phone buzz, while iPhone Safari ignores the buzz. [1] Ask each phone user to demonstrate how the displayed alert will be noticed.
Reusing an earlier OperatorLink link without checking its timing can interrupt preparation: a jobsite link stops working 12 hours after the first person joins it. [1] A jobsite with nobody in it is wiped after 3 idle hours. [1]
Writing only “passed” hides the limits of the check. Name the equipment, positions, messages and changeover that were demonstrated, and keep unresolved actions attached to the review.
Frequently asked questions
Is OperatorLink free to use?
OperatorLink is currently free to use. [1] It runs in a phone browser with no app install. [1] For the risk review, ask the crew to demonstrate joining and exchanging the intended messages on the phones proposed for the job. Record the observed result separately from the cost.
What happens when the OperatorLink STOP button is pressed?
STOP releases every held direction on every phone and shows a full-screen alert to everyone else. [1] HOLD and SLOW stay on for everyone until the last person leaves the jobsite. [1] During the preparation check, ask the crew to explain these different responses and demonstrate them with no load movement.
How long does an OperatorLink jobsite link stay active?
A jobsite link stops working 12 hours after the first person joins it. [1] A jobsite with nobody in it is wiped after 3 idle hours. [1] Before the planned demonstration, ask the person arranging the check to confirm which link the crew will use and have everyone demonstrate joining.
Do OperatorLink STOP signals make every phone buzz?
On Android browsers, signals such as STOP make the phone buzz; iPhone Safari ignores the buzz. [1] Ask each participant to demonstrate how the alert appears on the phone intended for the job. Record the phone used and ask how the crew will acknowledge the message during the communication check.
Can OperatorLink send voice and short crew messages?
Anyone who joins can take part in a voice call run from the phone browser. [1] One-tap radio-style calls such as Go Ahead, Copy That and All Clear are sent as chat messages. [1] Ask the crew which form of message the plan calls for and have the receiver demonstrate acknowledging it.
OperatorLink is currently free to use, and no paid plan is built yet. [1]
Try OperatorLinkSources
Related comparisons
- How to assess crane signal trainees passing calls clearly
- How to assign crane crews to jobs for crane dispatchers in 2026
- How to assign who gives signals during a pick for lift planners
- How MEWP crews call a stop near overhead hazards
- Calling material lifts to upper decks for scaffolding crews
- How to call hold during tight lifts for plant riggers
- How to call hold when a hose shifts under pressure
- Call hold when a load goes out of level
- Call HOLD when a load nears live process equipment
- How to call hold when a load shifts during a lift