---
{"title": "How to Pass Hold and Stop Calls to a Crane Operator", "description": "Learn how power plant outage crews can pass HOLD and STOP calls to an overhead crane operator, compare communication options and avoid missed signals.", "url": "https://2dig.com/how-to-pass-hold-and-stop-calls-to-the-overhead-crane-operator-for-power-plant-outage-crews/", "date": "2026-11-08"}
---
Learn how power plant outage crews can pass HOLD and STOP calls to an overhead crane operator, compare communication options and avoid missed signals.

During a power plant outage, agree on the signal words, confirm who sends and receives each call, and check the communication method before lifting starts. OperatorLink shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser. [^1] The crew joins from a shared link or QR code. [^1]

| Option | What it does | Fee | Card fee |
|---|---|---|---|
| OperatorLink | Shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a browser. [^1] | Currently free to use, with no paid plan built yet. [^1] | not published |
| Two-way radio | not published | not published | not published |
| Phone video call app | not published | not published | not published |
| Direct voice communication | not published | not published | not published |

## What you need before you start

Before an outage lift begins, the crew needs a clear way to pass HOLD and STOP calls to the overhead crane operator. Agree on who can call each signal, who must acknowledge it, and what the operator should do when a call arrives. Everyone involved should understand the site's lifting procedure and know which communication method is being used.

Check that the chosen method works at the operator's position and at the places where the ground crew will stand. Consider machine noise, the distance between people, phone reception, background work and whether the operator can safely see or hear the person sending the call.

If using OperatorLink, have a phone with a working browser and data signal ready. Button presses, chat and voice pass between phones in a browser. [^1] The person starting the jobsite shares a link or QR code, and the crew joins from it. [^1] No app install is needed to use it in a phone browser. [^1]

Agree on how the crew will treat HOLD and SLOW, because these signals stay on for everyone in the jobsite until the last person leaves. [^1] Check each phone, decide who will monitor incoming calls, and keep the site's established backup communication method available before moving a load.

## Step by step

1. Agree on the calls before the lift. Make sure the operator and ground crew understand what HOLD and STOP mean for the job.

2. Choose the communication method. Consider the operator's position, noise, distance, phone reception and the crew's normal working arrangements. Decide how to communicate if the main method stops working.

3. Prepare the phones or radios. If the crew chooses a phone-based method, check that each phone has a working browser and data signal. OperatorLink passes button presses, chat and voice between phones in a browser. [^1] If the crew uses another method, confirm that it can be heard or seen at the positions where it is needed.

4. **Start the shared jobsite if using OperatorLink.** The person starting the jobsite opens it from a phone browser. No app install is needed. [^1] That person shares a link or QR code, and the other crew members join from it. [^1] 

5. **Check the signals together.** OperatorLink shows STOP, HOLD and SLOW to the jobsite crew. [^1] HOLD and SLOW remain on for everyone in the jobsite until the last person leaves. [^1]

6. **Keep move calls active when needed.** In OperatorLink, holding a move button keeps sending that move to the other phones. If the move stops arriving for 2 seconds, the other phones drop it. [^1] The crew should understand the limits of this behaviour and keep following the agreed lift procedure.

7. **Treat STOP as a call to stop and check.** In OperatorLink, STOP releases every held direction on every phone and shows a full-screen alert to everyone else. [^1] 

8. **Keep voice communication available.** Anyone who joins an OperatorLink jobsite can take part in a voice call from the phone browser. [^1] One-tap radio-style calls such as Go Ahead, Copy That and All Clear are sent as chat messages. [^1] 

9. **Close out the session after the work.** Make sure the crew knows when the communication session has ended. An OperatorLink jobsite link stops working 12 hours after the first person joins it. [^1] A jobsite with nobody in it is wiped after 3 idle hours. [^1] Start a fresh jobsite and share its new link or QR code when needed for another shift.

## Tools that can do it

**OperatorLink**

OperatorLink is made by the team that publishes this site. It shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser. [^1] The page runs in a browser, so nobody needs to install an app to use it. [^1] The person who starts a jobsite shares a link or QR code, and the crew joins from it. [^1] OperatorLink is currently free to use, and no paid plan is built yet. [^1] Check whether the crew wants these shared signals and phone-based communication for the work.

**Two-way radio**

A two-way radio is another option to consider for passing voice calls between the ground crew and the operator. Check whether the crew can hear calls over plant noise, whether the right people can communicate from their working positions, and how HOLD and STOP will be stated and acknowledged. Confirm the channel and the site's procedures before lifting.

**Phone video call app**

A phone video call app is another option to assess. Check whether the operator and signal person can hear one another clearly, whether the required people remain visible, and whether the call can be maintained for the planned work. Do not assume that every app handles alerts, screen locking or weak reception in the same way.

**Direct voice communication with an agreed backup**

Where the work arrangement allows it, the crew can assess whether direct voice communication is practical from the operator's position and the signal person's location. Check distance, obstructions, noise and how the call will be acknowledged. Decide in advance what the crew will do if the primary method becomes unclear or unavailable.

Choose according to the actual site conditions and the communication procedure for the lift. Confirm how every option handles STOP, how HOLD is acknowledged, and what the crew must do if a call cannot be heard or confirmed.

## Common mistakes to avoid

**Starting without agreeing on the meaning of each call.** The operator and ground crew should know what HOLD and STOP require before the lift begins. Do not rely on people interpreting an unfamiliar signal during a move.

**Assuming every phone alerts in the same way.** On Android browsers, signals such as STOP make the phone buzz, while iPhone Safari ignores the buzz. [^1] Check the screen and alert behaviour on the actual phones before work starts.

**Forgetting that HOLD and SLOW stay on.** In OperatorLink, both signals remain on for everyone in the jobsite and are cleared when the last person leaves. [^1] Make sure the crew understands this behaviour before starting another move.

**Treating a phone signal as proof that a call was received.** OperatorLink drops a held move on the other phones if it stops arriving for 2 seconds. [^1] Follow the site's communication checks and keep an agreed backup ready.

**Reusing an old jobsite link without checking it.** OperatorLink links stop working 12 hours after the first person joins, and empty jobsites are wiped after 3 idle hours. [^1] [^1] Confirm that the crew has joined the right session before relying on it.

Decide before lifting how the operator and ground crew will communicate if the main method is unclear or unavailable.

## Things to check before you choose

Before selecting a way to pass HOLD and STOP calls, check the outage site's lifting procedure, the operator's communication needs, the positions of the ground crew and the conditions where the load will move. Check which method the crew can hear or see from each position.

For OperatorLink, check phone data reception, browser access, alert behaviour and session timing. The jobsite link expires 12 hours after the first person joins, and a jobsite with nobody in it is wiped after 3 idle hours. [^1] [^1] The page can be added to a phone's home screen as a standalone app. [^1]

Also check how the crew will acknowledge STOP, how HOLD will be cleared, who is allowed to make a call and how the site will handle a lost or unclear signal. Confirm these points with the responsible site personnel before choosing a method for the lift.

## Frequently asked questions

### How can OperatorLink pass HOLD and STOP calls to a crane operator?

OperatorLink shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser. [^1] The person starting the jobsite shares a link or QR code, and the crew joins from it. [^1]

### Is OperatorLink free for power plant outage crews?

OperatorLink is currently free to use, and no paid plan is built yet. [^1] It runs in a phone browser without requiring an app install. [^1] The phones still need a working data signal for browser communication. [^1] Check phone reception at the work locations before relying on it.

### What happens when STOP is pressed in OperatorLink?

STOP releases every held direction on every phone and shows a full-screen alert to everyone else in the jobsite. [^1] HOLD and SLOW behave differently because they stay on for everyone until the last person leaves the jobsite. [^1]

### Do OperatorLink STOP alerts make every phone buzz?

On Android browsers, signals such as STOP make the phone buzz, while iPhone Safari ignores the buzz. [^1] Check how alerts appear on the actual phones the crew will use. Check what backup communication the crew has if a signal is missed or unclear.

### How long does an OperatorLink jobsite link remain active?

An OperatorLink jobsite link stops working 12 hours after the first person joins it. [^1] A jobsite with nobody in it is wiped after 3 idle hours. [^1] For another shift, check whether the existing link still opens the session. If a new jobsite is needed, start it and share its link or QR code with the crew before work begins.

### Can the crane crew speak to each other through OperatorLink?

Anyone who joins an OperatorLink jobsite can take part in a voice call run from the phone browser. [^1] One-tap radio-style calls such as Go Ahead, Copy That and All Clear are sent as chat messages. [^1] Check phone reception before relying on voice calls and short messages.

OperatorLink is currently free to use, and no paid plan is built yet. [^1] - [Visit OperatorLink](/go/start)

## Sources

[^1]: OperatorLink's own description of itself (the product of this site's publisher) (/go/start)
