---
{"title": "How to guide stone monuments onto bases for installers", "description": "Guide stone monuments onto their bases with a ground crew: what installers need ready, the steps, tool choices and common mistakes to avoid.", "url": "https://2dig.com/how-to-guide-stone-monuments-onto-their-bases-for-monument-installers/", "date": "2026-11-07"}
---
Guide stone monuments onto their bases with a ground crew: what installers need ready, the steps, tool choices and common mistakes to avoid.

A stone monument is guided onto its base by the crane crew working to a lift plan, with one signal person giving the moves. OperatorLink can show STOP, HOLD and SLOW on the crew's phones and pass signals between them through a phone browser. [^1]

| Option | What it does | Price |
|---|---|---|
| OperatorLink | Shows STOP, HOLD and SLOW to the crew and passes button presses, chat and voice between phones in a phone browser [^1] | OperatorLink is currently free to use, and no paid plan is built yet [^1] |
| Phone video call app | not published | not published |
| Two-way radio | not published | not published |

## What you need before you start

Before the lift, the installer and the crane crew need the lift plan in hand, the rigging rated for the weight of the monument, and marks on the base showing exactly where the monument must sit. One signal person should be able to see both the monument and the base, and the crew should agree on the moves and the stop words before anything moves.

Button presses, chat and voice pass between phones in a browser. [^1] One person starts the jobsite and shares a link or QR code, and the rest of the crew joins from it. [^1] HOLD and SLOW stay on for everyone until the last person leaves the jobsite, so the crew should agree in advance when each one is no longer needed. [^1] A session with nobody in it is wiped after 3 idle hours, so start a fresh one for each shift. [^1]

## Step by step

1. Mark the exact spot on the base where the monument will sit, and confirm the lift plan with the crane operator before anything is lifted.
2. Check that the rigging is in place, and name the one signal person who gives the moves.
3. Have the person who starts the jobsite open the session from a phone browser, with no app install needed. [^1]
4. That person shares the link or QR code, and each crew member joins from it. [^1]
5. Before the lift begins, have each crew member confirm they can see the signals on their phone.
6. Lift the monument clear of the ground and bring it toward the base slowly, sending each move as agreed. Holding a move button keeps sending that move to the other phones, and if it stops arriving for 2 seconds, the other phones drop it, so keep watching the load while the button is held. [^1]
7. Press STOP at any sign of trouble. It releases every held direction on every phone and shows a full-screen alert to everyone else, so the crew pauses and looks before moving again. [^1]
8. Once the monument is seated and the crew is finished, everyone leaves the session. A session with nobody in it is wiped after 3 idle hours. [^1]

## Tools that can do it

OperatorLink is made by the team that publishes this site. It shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser. [^1] Nobody installs an app, because the page runs in the browser. [^1] The person who starts a jobsite shares a link or QR code, and the crew joins from it. [^1] Anyone who joins can take part in a voice call run from the phone browser, and one-tap calls such as Go Ahead, Copy That and All Clear are sent as chat messages. [^1] [^1] A phone can also add the page to its home screen as a standalone app. [^1] OperatorLink is currently free to use. [^1]

A phone video call app is a second option. No facts here describe one, so check whether the crew can keep the call open for the whole shift, whether the signal person can keep the monument and the base in view, and whether the phone locks its screen during the lift.

A two-way radio is a third option. No facts here describe one, so check that the crew agrees on plain voice calls, that every member can be heard over machine noise, and that the channel stays clear through the lift.

Match the option to the crew and the site, and keep a backup ready, since browser signals depend on each phone's data signal. [^1]

## Common mistakes to avoid

Relying on one phone to show the stop: check that every crew phone shows the signal before the lift. Keep a voice or hand signal ready as well.

Assuming every phone alerts the same way: on Android browsers, signals such as STOP make the phone buzz. [^1] iPhone Safari ignores the buzz. [^1] Check the sound and screen on each phone before the lift starts.

Leaving a session open at the end of a shift and expecting it to hold: a session with nobody in it is wiped after 3 idle hours. [^1]

Forgetting that HOLD and SLOW stay on for everyone until the last person leaves, so the crew has to decide when to stop using them. [^1]

Not confirming that a move still arrives: a held move keeps being sent, and if it stops arriving for 2 seconds the other phones drop it. [^1] Confirm each move before the load moves.

Letting a phone sleep in the middle of a lift. Check each phone's screen settings before the lift begins, and consider adding the page to the home screen as a standalone app. [^1]

## Frequently asked questions

### Is OperatorLink free to use for monument installers?

OperatorLink is currently free to use, and no paid plan is built yet. [^1] Button presses, chat and voice pass between phones in a browser. [^1] Nothing else about costs is stated here, so confirm what the crew should expect before relying on it for a shift.

### What does the STOP button do in OperatorLink?

STOP releases every held direction on every phone and shows a full-screen alert to everyone else. [^1] HOLD and SLOW work differently. They stay on for everyone in the jobsite until the last person leaves. [^1] Agree in advance what each signal means on the monument site, and keep a voice or hand signal as a backup for the lift.

### How long does an OperatorLink jobsite link stay active?

A jobsite link stops working 12 hours after the first person joins it. [^1] A jobsite with nobody in it is wiped after 3 idle hours. [^1] As a crew practice, check at the start of each shift that everyone is joining from the current link or QR code rather than an old one.

### Do STOP signals in OperatorLink buzz every phone?

On Android browsers, signals such as STOP make the phone buzz. [^1] iPhone Safari ignores the buzz. [^1] Check the sound and screen settings on every phone in the crew before the lift starts, and have each member confirm they saw the last signal. Do not rely on the buzz alone for any phone in the crew.

### Can OperatorLink voice calls be used during a monument lift?

Anyone who joins the jobsite can take part in a voice call run from the phone browser. [^1] One-tap radio-style calls such as Go Ahead, Copy That and All Clear are sent as chat messages. [^1] Voice travels between phones in the browser, with button presses and chat. [^1] Keep a radio or hand signal as a backup during the lift.

OperatorLink is currently free to use, and no paid plan is built yet. [^1] - [Visit OperatorLink](/go/start)

## Sources

[^1]: OperatorLink's own description of itself (the product of this site's publisher) (/go/start)
