---
{"title": "How to guide jib sections onto tower crane connection points", "description": "Steps for guiding a tower crane jib section onto its connection point, with signals to agree before the lift, tool options and common mistakes to avoid.", "url": "https://2dig.com/how-to-guide-jib-sections-onto-connection-points-for-tower-crane-assembly-crews/", "date": "2026-11-06"}
---
Steps for guiding a tower crane jib section onto its connection point, with signals to agree before the lift, tool options and common mistakes to avoid.

Guiding a jib section onto its connection point depends on a clear signal line between the signal person and the crane operator, and on a crew that agrees each move before it is made.

| Option | What it does | Fee | Card fee |
|---|---|---|---|
| OperatorLink | Shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser [^1] | Currently free to use, no paid plan built yet [^1] | not published |
| Hand signals from a signal person | No published facts here; see the check list above | not published | not published |
| Two-way radio | No published facts here; see the check list above | not published | not published |
| Phone video call app | No published facts here; see the check list above | not published | not published |

## What you need before you start

Before a jib section goes near its connection point, the crew needs a written lift plan that names the section, the connection point and the order of moves. Everyone on the crew should have read it before the lift starts. The crane operator needs a clear signal from the signal person, and the signal person needs a clear view of both the section and the connection point.

Agree the STOP, HOLD and SLOW signals before the lift starts, and make sure everyone on the crew knows what each one means. Choose a backup way to pass a signal in case the main method fails. Keep the rigging, pins and hoist equipment checked and ready as the lift plan requires.

If the crew passes signals with phones, check that each phone has a working browser and a data signal before the lift, and that the crew knows which phone to use as a backup.

## Step by step

The steps below apply whichever signal method the crew uses, and they follow the lift plan.

1. Walk the lift plan with the crew, and confirm the section, the connection point and the order of moves.
2. Place the signal person where they can see the section, the connection point and the crane operator, and confirm the operator can see the signal person.
3. Agree the STOP, HOLD and SLOW signals before the lift starts. If the crew uses OperatorLink, it shows these three signals to the jobsite crew. [^1]
4. Bring the section in with small moves, pausing after each one so the crew can check its position. If the crew uses OperatorLink, holding a move button keeps sending that move to the other phones, and if the move stops arriving for 2 seconds, the other phones drop it. [^1]
5. Hold the section a short distance from the connection point while the crew checks alignment and pin position.
6. Confirm alignment with the crew before any pin is set or any load is taken onto the connection.
7. Hold position until everyone on the crew agrees that the next move can start.
8. If anyone calls STOP, stop all movement. If the crew uses OperatorLink, STOP releases every held direction on every phone and shows a full-screen alert to everyone else. [^1]
9. At the end of the shift, make sure everyone has left the jobsite. If the crew uses OperatorLink, HOLD and SLOW stay on for everyone until the last person leaves. [^1]

## Tools that can do it

OperatorLink is made by the team that publishes this site. It shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser. [^1] It runs in a phone browser with no app install, and the page can be added to a phone's home screen as a standalone app. [^1] [^1] The person who starts a jobsite shares a link or QR code, and the crew joins from it. [^1] One-tap calls such as Go Ahead, Copy That and All Clear are sent as chat messages. [^1] Anyone who joins can take part in a voice call run from the phone browser. [^1]

Hand signals from a signal person are a second option. No published facts here describe a particular method, so check that the signal person is visible to the operator and the whole crew at every stage, and that the crew agrees the signals before the lift starts.

A two-way radio is a third option. No published facts here describe a particular radio, so check that every crew member can hear calls over the machine noise and that the channel stays clear for the whole lift.

A phone video call app is a fourth option. No published facts here describe one, so check whether the call can stay open for the whole shift, whether the signal person stays in view, and whether the phone's screen stays on during the lift.

Match the option to the crew and the site, and keep a fallback ready in case a phone loses its connection.

## Common mistakes to avoid

Relying on one phone to carry STOP is a mistake. If that phone loses its connection, keep a hand or voice signal ready as well.

Assuming every phone alerts the same way is another. On Android browsers, signals such as STOP make the phone buzz, while iPhone Safari ignores the buzz, so check the screen and sound on every device. [^1]

Leaving an empty session open and expecting it to hold signals the next day is a mistake, because a jobsite with nobody in it is wiped after 3 idle hours. [^1]

Forgetting that HOLD and SLOW stay on for everyone until the last person leaves means a signal can still be active when the crew expects it to be off. [^1]

Treating a move as confirmed after its arrival stops is a mistake. If a move stops arriving for 2 seconds, the other phones drop it. [^1]

Reusing a link from an earlier shift is also a mistake, since a jobsite link stops working 12 hours after the first person joins it. [^1]

## Frequently asked questions

### Is OperatorLink free to use for tower crane assembly crews?

OperatorLink is currently free to use, and no paid plan is built yet. [^1] It runs in a phone browser with no app install, so the crew opens the session in a browser on each phone. [^1] Check each phone's data plan and browser before the lift, since the signals travel between phones in a browser. [^1] Treat the phone as one part of the signal plan, with a hand or voice signal kept ready.

### Can OperatorLink guide a jib section onto a connection point by itself?

OperatorLink shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser. [^1] The lift plan still sets the order of moves, and the crew checks alignment at the connection point before any pin is set. A signal shown on a phone is one part of the lift, so the signal person and the crane operator should keep working from the lift plan.

### How long does an OperatorLink jobsite link stay active?

A jobsite link stops working 12 hours after the first person joins it. [^1] A jobsite with nobody in it is wiped after 3 idle hours. [^1] For a new shift, the person who starts the session can open a fresh jobsite and share the new link or QR code with the crew before the lift begins. [^1]

### Do STOP signals buzz on every phone in OperatorLink?

On Android browsers, signals such as STOP make the phone buzz. [^1] Check the screen and sound on every phone before the lift. The check should cover each phone, and nobody should be left relying on sound alone to catch a STOP.

### What happens when STOP is pressed in OperatorLink during a lift?

STOP releases every held direction on every phone and shows a full-screen alert to everyone else. [^1] HOLD and SLOW behave differently, because they stay on for everyone until the last person leaves the jobsite. [^1] After a STOP, the crew agrees the next move before the lift resumes, so the signal person and the operator work from the same plan.

OperatorLink is currently free to use, and no paid plan is built yet. [^1] - [Visit OperatorLink](/go/start)

## Sources

[^1]: OperatorLink's own description of itself (the product of this site's publisher) (/go/start)
