---
{"title": "Coordinate MEWP Moves Around Site Equipment", "description": "Plan platform moves around other site equipment. Prepare the crew, agree on signals, compare tools and avoid common coordination mistakes.", "url": "https://2dig.com/how-to-coordinate-platform-moves-around-other-site-equipment-for-mobile-elevated-work-platform-crews/", "date": "2026-10-28"}
---
Plan platform moves around other site equipment. Prepare the crew, agree on signals, compare tools and avoid common coordination mistakes.

To coordinate platform moves around other site equipment, agree on the route, the person directing movement, the signals everyone will use, and when movement must stop. Check the path and nearby equipment before moving, keep the crew in communication, and confirm each move before continuing. OperatorLink is one option for showing STOP, HOLD and SLOW to the jobsite crew and passing button presses, chat and voice between phones in a phone browser. [^1]

| Option | What it does | Fee | Card fee |
|---|---|---|---|
| OperatorLink | Shows STOP, HOLD and SLOW to the crew and passes button presses, chat and voice between phones in a browser. [^1] | Currently free to use, no paid plan built yet. [^1] | not published |
| Two-way radio | not published | not published | not published |
| Hand signals | not published | not published | not published |
| Phone video or voice call app | not published | not published | not published |

## What you need before you start

Before moving a platform around other site equipment, gather the operator, ground crew and anyone responsible for coordinating the move. Agree on who gives movement signals, who watches the surrounding area, and who can call a stop. Make sure everyone understands the route and knows which signal means stop, hold position or move slowly.

Walk the intended route and check the space around parked equipment, vehicles, materials and other work areas. Identify places where the platform could meet an obstruction or where another machine could enter its path. Check the ground, turning space, overhead clearance and intended stopping points against the equipment instructions and the conditions at the site.

Choose a way for the crew to communicate that everyone can use throughout the move. This may be agreed hand signals, radios, a phone call or a phone browser that passes movement signals between crew members. OperatorLink shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser. [^1]

Check that each person can receive the agreed signals and speak up if the route changes. If using a phone-based option, check the data signal and the screen on each phone. Set a clear rule that movement pauses whenever the operator loses sight of the route, a signal is unclear, or equipment enters the planned path.

## Step by step

1. **Agree on the route.** Identify where the platform starts, where it needs to go, and which areas must stay clear. Mark the places where the platform will turn, pass other equipment or wait for a clear path. Recheck the route if site conditions change.

2. **Assign clear responsibilities.** Agree on who operates the platform, who gives movement signals and who watches for nearby equipment or people. Make sure everyone knows who can call STOP. Avoid giving conflicting directions from different positions.

3. **Choose the communication method.** Use an agreed method that the operator and ground crew can follow. If the crew uses OperatorLink, the person starting the jobsite shares a link or QR code, and crew members join from it using their phone browsers. [^1] Confirm that everyone is in the session before moving.

4. **Check the path immediately before moving.** Look for equipment that has moved since the route was agreed, changing work areas, blocked turning space and overhead obstructions. Do not assume a previously clear route remains clear. Pause until the people responsible for the move agree that it is ready.

5. **Give one clear movement instruction at a time.** Make sure the operator understands whether to move, hold or stop. OperatorLink displays STOP, HOLD and SLOW to the jobsite crew. [^1] With OperatorLink, holding a move button keeps sending that move to the other phones, and the other phones drop it if it stops arriving for 2 seconds. [^1] The crew should still confirm what is happening around the platform rather than relying on a signal alone.

6. **Move in controlled stages.** Check the next section of the route before proceeding into it. Watch the gap between the platform and nearby equipment, and stop before entering an area where the route or clearance is uncertain. Do not continue simply because the previous section was clear.

7. **Stop when conditions change.** If another machine approaches, a person enters the path, visibility is lost or the operator receives conflicting instructions, stop the movement. With OperatorLink, STOP releases every held direction on every phone and shows a full-screen alert to everyone else. [^1] Confirm the area is clear and agree on the next instruction before resuming.

8. **Confirm the final position.** Once the platform reaches the agreed location, communicate that movement has ended. Check that the platform is positioned as intended and that nearby equipment can continue operating without entering its working area. If another move is needed, reassess the route and repeat the coordination steps.

## Tools that can do it

**OperatorLink**

OperatorLink is made by the team that publishes this site, 2Dig. It shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser. [^1] Nobody needs to install an app because it runs in a phone browser. [^1] The person who starts a jobsite shares a link or QR code, and the crew joins from it. [^1]

STOP releases every held direction on every phone and shows a full-screen alert to everyone else. [^1] HOLD and SLOW stay on for everyone in the jobsite and are cleared when the last person leaves. [^1] One-tap radio-style calls such as Go Ahead, Copy That and All Clear are sent as chat messages, and anyone who joins can take part in a voice call from the phone browser. [^1] [^1] OperatorLink is currently free to use, and no paid plan is built yet. [^1]

A jobsite link stops working 12 hours after the first person joins it, and a jobsite with nobody in it is wiped after 3 idle hours. [^1] [^1] On Android browsers, signals such as STOP make the phone buzz, while iPhone Safari ignores the buzz. [^1] Check the phone screens and data signal before relying on this method for a move.

**Two-way radios**

Two-way radios are another option to consider for coordinating the operator and ground crew. Before choosing them, check whether everyone involved has access to a radio, can hear instructions over site noise, and understands the agreed words for moving, holding and stopping. Confirm how the crew will handle interruptions and overlapping calls.

**Hand signals**

Agreed hand signals can be used to communicate movement instructions when the people involved can see one another. Before a move, confirm the meaning of each signal and the operator's view of the signal person. Check how the crew will communicate if the operator cannot see the signal or the route requires the signal person to change position.

**Phone video or voice calls**

A phone call is another option to assess for crew communication. Check whether everyone can hear instructions clearly and whether the people who need to see the route can maintain a useful view. Confirm what the crew will do if the call is interrupted or a phone screen becomes unavailable.

Choose the communication method around the site layout, visibility, noise and the equipment being moved. Keep an agreed way to stop the operation if communication becomes unclear.

## Common mistakes to avoid

**Starting before the route is agreed.** If the operator and ground crew have different ideas about where the platform will go, movement can begin before the next section is clear. Confirm the route and stopping points before moving.

**Assuming nearby equipment will stay put.** Other site equipment can change the available space. Recheck the route before each stage and stop if the gap, turning area or overhead clearance becomes uncertain.

**Giving conflicting instructions.** Multiple people directing the same move can leave the operator unsure which instruction to follow. Agree on who directs movement and make sure everyone knows how to call a stop.

**Continuing after losing communication.** Do not assume an instruction has arrived because it was sent. With OperatorLink, if a held move stops arriving for 2 seconds, the other phones drop it. [^1] Pause movement if the operator or crew cannot confirm the current instruction.

**Assuming every phone alerts in the same way.** On Android browsers, signals such as STOP make the phone buzz, while iPhone Safari ignores the buzz. [^1] Check each phone's screen and the agreed alert method before the move.

**Leaving a signal active without checking it.** OperatorLink keeps HOLD and SLOW on for everyone in the jobsite until the last person leaves. [^1] Make sure the crew understands how these signals behave before use.

**Resuming without a fresh check.** After a stop, check the path and nearby equipment again, confirm that the original reason for stopping has been resolved, and agree on the next movement instruction before continuing.

## Things to check before you choose

Before settling on a communication method, check how it will work in the actual work area. Can the operator receive clear instructions throughout the move? Can the ground crew see the route and spot equipment that may enter it? Does the method make it clear when movement must stop?

For a phone-based method, check the data signal, browser behaviour, screen visibility and alerts on the phones the crew will use. OperatorLink runs in a phone browser with no app install needed. [^1] A jobsite link stops working 12 hours after the first person joins it, and a jobsite with nobody in it is wiped after 3 idle hours. [^1] [^1]

For radios, hand signals or calls, check how the crew will communicate if the operator loses sight of the signal person, the work area becomes noisy or another machine enters the route. Agree on what happens if the normal communication method stops working. The selected method should support a clear stop instruction and a confirmed process for resuming movement.

## Frequently asked questions

### How can platform crews coordinate moves around other equipment?

Agree on the route, identify nearby equipment and obstructions, assign responsibility for movement signals, and choose a communication method everyone can follow. Check the path before each stage of movement. Stop if another machine enters the route, the operator loses sight of the signal person or an instruction is unclear. Resume only after the crew confirms the route is clear and agrees on the next instruction.

### Can OperatorLink show movement signals to a MEWP crew?

OperatorLink shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser. [^1] STOP releases every held direction on every phone and shows a full-screen alert to everyone else. [^1] The crew should agree on how these signals will be used before starting a move and check that every member can receive them.

### Does OperatorLink need to be installed on every phone?

OperatorLink runs in a phone browser, so an app install is not needed. [^1] The person who starts a jobsite shares a link or QR code, and the crew joins from it. [^1] Check that each phone has a working data signal and that every crew member has joined before movement begins.

### What happens if an OperatorLink movement signal stops arriving?

Holding a move button keeps sending that move to the other phones, and if it stops arriving for 2 seconds, those phones drop it. [^1] The crew should not assume that a previously sent instruction is still arriving. Pause movement if communication becomes unclear, check the route and agree on a fresh instruction before continuing.

### Does OperatorLink alert every phone with a vibration?

On Android browsers, signals such as STOP make the phone buzz, while iPhone Safari ignores the buzz. [^1] Check the alert on each phone before the move so the crew understands what it will see or feel. Make sure everyone knows to watch the screen and follow the agreed stop procedure if a signal is missed or unclear.

### How long does an OperatorLink jobsite session last?

A jobsite link stops working 12 hours after the first person joins it. [^1] A jobsite with nobody in it is wiped after 3 idle hours. [^1] For a later shift, check whether the existing link still works and start a new jobsite if needed. Confirm that the crew has joined the active session before coordinating a move.

### Is OperatorLink free to use for MEWP crews?

OperatorLink is currently free to use, and no paid plan is built yet. [^1] It passes button presses, chat and voice between phones in a browser. [^1] Phone data service may still be needed for communication, so check the available connection and the crew's arrangements before using it at the site.

OperatorLink is currently free to use, and no paid plan is built yet. [^1] - [Visit OperatorLink](/go/start)

## Sources

[^1]: OperatorLink's own description of itself (the product of this site's publisher) (/go/start)
