---
{"title": "How to Coordinate Crane Swaps in Mining Maintenance", "description": "Learn how mining maintenance crews can prepare for heavy component swaps, agree on signals with the crane operator, and choose a communication method.", "url": "https://2dig.com/how-to-coordinate-heavy-component-swaps-with-the-crane-operator-for-mining-maintenance-crews/", "date": "2026-10-27"}
---
Learn how mining maintenance crews can prepare for heavy component swaps, agree on signals with the crane operator, and choose a communication method.

To coordinate a heavy component swap, agree on the lift plan, confirm who directs the movement, check the communication method, and make sure the crew understands each signal before the lift starts. OperatorLink shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser. [^1] Keep the communication method clear throughout the swap, and agree on a backup method before moving the load.

| Option | What it does | Fee | Card fee |
|---|---|---|---|
| OperatorLink | Shows STOP, HOLD and SLOW to the crew and passes button presses, chat and voice between phones in a browser [^1] | Currently free to use, with no paid plan built yet [^1] | not published |
| Two-way radio | not published | not published | not published |
| Hand signals | not published | not published | not published |
| Phone video call app | not published | not published | not published |

## What you need before you start

Before coordinating a heavy component swap at the work site, make sure the maintenance crew, crane operator and signal person agree on the work to be done and how the load will be directed. Identify the component being removed, the replacement component, the intended movement and the people responsible for giving and receiving signals.

Prepare the lift plan and confirm the lifting points, rigging arrangements, load information, landing area and access around the equipment. Check that the crane operator and crew understand the planned sequence, including where the component will be held while connections are released or secured. Confirm who has authority to call STOP and how the crew will respond when movement needs to pause.

Choose a communication method that the crew can use throughout the swap. OperatorLink shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser. [^1] The phones need a working data signal for communication between them. [^1]

Before the lift, check the work area for noise, poor visibility, obstructions and locations where a crew member may not see a signal. Agree on a backup communication method, confirm that everyone understands the signals, and do not begin until the people involved are ready.

## Step by step

1. **Agree on the component swap.** Confirm which component is coming out, which component is going in, and the sequence of work. Review the lift plan with the crane operator and the people responsible for rigging, guiding and securing the component.

2. **Assign communication roles.** Identify the signal person and agree on who gives movement instructions. Make sure the crane operator knows whose signals to follow and how STOP will be communicated. The crew should understand how to pause work if a signal is unclear or a person loses sight of the load.

3. **Check the work area.** Confirm that the travel path and landing area are ready. Check that the crew can reach their work positions without entering an unsafe area and that no one needs to stand where the suspended component could trap them. Resolve access and visibility problems before the lift begins.

4. **Choose and check the communication method.** Agree on hand signals, radio communication or a suitable phone-based option. If using OperatorLink, the person starting the jobsite shares a link or QR code, and the crew joins from it. [^1] The signals, chat and voice pass between phones in a browser. [^1] Confirm that the crew can see and understand the signals before relying on the session, and agree on a backup method.

5. **Review the movement signals.** Make sure everyone understands how to communicate movement, a pause and an instruction to stop. With OperatorLink, holding a move button keeps sending that move to the other phones; if it stops arriving for 2 seconds, the other phones drop it. [^1] The crew should still confirm that the movement instruction is understood and that the operator is responding as expected.

6. **Take up the load according to the lift plan.** The operator follows the agreed signals while the crew watches the load, rigging and surrounding work area from their assigned positions. Do not continue a movement when the signal is unclear or a person cannot confirm that the area is clear.

7. **Pause before critical changes.** When the component reaches a planned holding point, communicate the pause and confirm that the crew is ready for the next task. Before removing attachments or connecting the replacement, follow the lift plan and the site's work procedure. OperatorLink's HOLD and SLOW signals stay on for everyone in the jobsite and are cleared when the last person leaves. [^1]

8. **Use STOP when movement must cease.** With OperatorLink, STOP releases every held direction on every phone and shows a full-screen alert to everyone else. [^1] After stopping, establish why the work paused and agree on the next instruction before movement resumes.

9. **Finish and confirm the swap.** Follow the planned sequence for landing, securing and releasing the lifting equipment. Confirm that the component is stable and that the crew is clear before the crane operator receives instructions for the next movement. Close out the communication session when the work is complete.

## Tools that can do it

**OperatorLink**

OperatorLink is made by the team that publishes this site. It shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser. [^1] It runs in a phone browser without an app install. [^1] The person who starts a jobsite shares a link or QR code, and the crew joins from it. [^1] Anyone who joins can take part in a voice call run from the phone browser. [^1] One-tap radio-style calls such as Go Ahead, Copy That and All Clear are sent as chat messages. [^1] OperatorLink is currently free to use, and no paid plan is built yet. [^1]

Before using it for a component swap, check phone signal coverage in the work area and confirm that the crew can see the signals. On Android browsers, signals such as STOP make the phone buzz, while iPhone Safari ignores the buzz. [^1] A jobsite link stops working 12 hours after the first person joins it. [^1] A jobsite with nobody in it is wiped after 3 idle hours. [^1]

**Two-way radio**

A two-way radio is another option to consider for coordinating instructions between the crane operator and ground crew. Agree on the channel, the words used for movement and pauses, and who is allowed to give directions. Check that the people involved can hear each other in the actual work area. Check the range, features and costs of the radio being considered before choosing it.

**Hand signals**

Hand signals are another way to communicate movement instructions when the operator and signal person have a clear view of each other. Agree on the signals before work starts and confirm that the operator can see the signal person from the operating position. Check the site's procedures for the signals required and how the crew should respond when visibility is lost.

**Phone video call app**

A phone video call app is another option to assess when the crew needs to see and hear a person during the swap. Check whether the app can keep the call available in the work area, whether the signal person's movements remain visible and whether the phone's screen or call settings interrupt communication. Check the features and fees of the app being considered.

Choose the communication method based on the lift plan, the work environment and the crew's ability to understand each instruction. Keep an agreed backup ready, and do not treat a phone-based signal as proof that the load or work area is safe.

## Common mistakes to avoid

**Starting before communication is checked.** A crew may be ready to handle the component while the operator cannot clearly see or hear the person giving directions. Confirm the method, signal meanings and backup plan before movement begins.

**Allowing several people to give conflicting directions.** Agree on who directs the crane and how any other crew member can call STOP. Everyone should know how to raise a concern without creating competing movement instructions.

**Assuming a phone signal will remain available.** OperatorLink passes button presses, chat and voice between phones in a browser. [^1] Check the data signal in the work area and keep the agreed backup available if phone communication becomes unreliable.

**Forgetting how HOLD and SLOW behave.** OperatorLink keeps these signals on for everyone in the jobsite until the last person leaves. [^1] Make sure the crew understands the state of the signal before the next movement.

**Expecting every phone to buzz.** On Android browsers, signals such as STOP make the phone buzz, while iPhone Safari ignores the buzz. [^1] Check what each device displays and agree on how the crew will notice an alert.

**Reusing an old jobsite session.** OperatorLink links stop working 12 hours after the first person joins, and empty jobsites are wiped after 3 idle hours. [^1] [^1] Start a fresh session when needed and confirm that the crew has joined it before work resumes.

**Continuing when an instruction is unclear.** Stop the movement, identify the cause of the confusion and re-establish communication before proceeding. Follow the lift plan and the site's procedures throughout the swap.

## Frequently asked questions

### How can mining maintenance crews coordinate a heavy component swap?

Agree on the lift plan, assign the person responsible for directing the crane, check the travel path and landing area, and confirm the communication method before moving the component. Make sure the crane operator and ground crew understand the movement and STOP signals. If a signal becomes unclear, pause the movement and re-establish communication before continuing. Keep a backup communication method ready throughout the job.

### Can OperatorLink help coordinate crane movements during maintenance?

OperatorLink shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser. [^1] The person who starts a jobsite shares a link or QR code, and the crew joins from it. [^1] The crew should confirm that everyone can see the signals and that phone data service is available before relying on the session.

### Is OperatorLink free for mining maintenance crews?

OperatorLink is currently free to use, and no paid plan is built yet. [^1] It runs in a phone browser without an app install. [^1] The crew still needs a working data signal for communication between phones. [^1] Check phone coverage in the work area and agree on a backup method before beginning the component swap.

### What happens when STOP is pressed in OperatorLink?

STOP releases every held direction on every phone and shows a full-screen alert to everyone else. [^1] HOLD and SLOW behave differently because they stay on for everyone in the jobsite until the last person leaves. [^1] The crew should understand these differences before the lift and confirm why movement stopped before agreeing to resume.

### Can OperatorLink be used on iPhones and Android phones?

OperatorLink runs in a phone browser, and button presses, chat and voice pass between phones in a browser. [^1] It does not require an app install. [^1] On Android browsers, signals such as STOP make the phone buzz, while iPhone Safari ignores the buzz. [^1] Check the display and alert behavior on the devices used by the crew before work begins.

### How long does an OperatorLink jobsite session last?

A jobsite link stops working 12 hours after the first person joins it. [^1] A jobsite with nobody in it is wiped after 3 idle hours. [^1] If a new session is needed for a later shift, the person starting the jobsite should share a fresh link or QR code and confirm that the crew has joined before the lift begins.

OperatorLink is currently free to use, and no paid plan is built yet. [^1] - [Visit OperatorLink](/go/start)

## Sources

[^1]: OperatorLink's own description of itself (the product of this site's publisher) (/go/start)
