---
{"title": "How to coordinate boom section assembly with an assist crane", "description": "Steps to coordinate boom section assembly with the assist crane, what to have ready, tool options and common mistakes for mobile crane assembly crews.", "url": "https://2dig.com/how-to-coordinate-boom-section-assembly-with-the-assist-crane-for-mobile-crane-assembly-crews/", "date": "2026-11-19"}
---
Steps to coordinate boom section assembly with the assist crane, what to have ready, tool options and common mistakes for mobile crane assembly crews.

Coordinate boom section assembly with the assist crane by agreeing each lift plan and naming one signal person for each crane before the first lift.

| Option | What it does | Fee | Card fee |
|---|---|---|---|
| OperatorLink | Shows STOP, HOLD and SLOW to the jobsite crew, and passes button presses, chat and voice between phones in a phone browser [^1] | Currently free to use, no paid plan built yet [^1] | not published |
| Two-way radio | not published | not published | not published |
| Hand signals from a signal person | not published | not published | not published |

## What you need before you start

Before the boom sections come off the trucks, the mobile crane assembly crew needs a written lift plan for each section, a named signal person for the assist crane operator, and an agreed order for the lifts. Confirm which crane carries each section, the load weights and the rigging each lift uses, and where each crew member stands. Every person who may call a stop should know the signal before the first lift starts.

If the crew passes signals by phone, button presses, chat and voice pass between phones in a browser. [^1] The person who starts a jobsite shares a link or QR code, and the crew joins from it. [^1] A jobsite link stops working 12 hours after the first person joins it, so a link from an earlier day may not open the session. [^1]

## Step by step

1. Agree the lift plan for each boom section with the assist crane operator, including the order of lifts, the landing point and who has the final say on each move.
2. Name one signal person for the assist crane and one for the boom crew, and confirm both can see the load at all times.
3. Check that every phone or radio works before the first lift. If the crew uses a phone browser, button presses, chat and voice pass between phones in that browser. [^1]
4. Open the jobsite session from a phone browser, which needs no app install. [^1] Share the link or QR code so every crew member and the assist crane signal person can join. [^1]
5. Before the first lift, confirm everyone is in the session, since button presses, chat and voice pass between the phones in it. [^1]
6. Set the hold points for the lift. HOLD and SLOW stay on for everyone in the jobsite and are cleared only when the last person leaves. [^1]
7. Keep each move button held while the section moves. Holding a move button keeps sending that move to the other phones; if it stops arriving for 2 seconds, they drop it. [^1]
8. When anyone sees a problem, press STOP. STOP releases every held direction on every phone and shows a full-screen alert to everyone else. [^1]
9. When the section is seated and the assembly step is done, have everyone leave the session. A jobsite with nobody in it is wiped after 3 idle hours. [^1]

## Tools that can do it

OperatorLink is made by the team that publishes this site. It shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser. [^1] [^1] It is currently free to use, and no paid plan is built yet. [^1] One-tap radio-style calls such as Go Ahead, Copy That and All Clear are sent as chat messages. [^1] Anyone who joins can take part in a voice call run from the phone browser. [^1] On Android browsers, signals such as STOP make the phone buzz, while iPhone Safari ignores the buzz, so check the sound and screen on every device. [^1]

A two-way radio is a second option. No facts here describe one, so check that every member can be heard over the noise of the crane and the site, and that the channel stays clear for the whole assembly.

Hand signals from a dedicated signal person are a third option. No facts here describe them, so check that the assist crane operator can see each signal person from the lift position, and that every signal is agreed before the lift.

Match the option to the crew and the site, and keep a fallback ready, since a phone browser depends on the phone's data signal.

## Common mistakes to avoid

Relying on one phone for the stop call. Keep a voice or hand signal ready as a backup, so a stop call still reaches the assist crane operator if a phone is not working.

Assuming every phone alerts the same way. On Android browsers, signals such as STOP make the phone buzz, while iPhone Safari ignores the buzz, so check the sound and screen on every device. [^1]

Reusing an old link. A jobsite link stops working 12 hours after the first person joins it. [^1]

Losing track of HOLD or SLOW. They stay on for everyone until the last person leaves, so the crew should confirm which ones are still set. [^1]

Letting a move button go while the section is still moving. If a move stops arriving for 2 seconds, the other phones drop it. [^1]

Forgetting that an empty session is wiped after 3 idle hours. [^1]

Assuming the phone screen stays on during the assembly. The app can be added to a phone's home screen as a standalone app. [^1]

## Frequently asked questions

### Is OperatorLink free to use for boom section assembly?

OperatorLink is currently free to use, and no paid plan is built yet. [^1] It runs in a phone browser, with no app install needed. [^1] Keep a radio or hand signal ready as a backup for the assist crane operator.

### What does STOP do in OperatorLink during an assist crane lift?

STOP releases every held direction on every phone in the session and shows a full-screen alert to everyone else. [^1] HOLD and SLOW behave differently, since they stay on for everyone until the last person leaves the jobsite. [^1] Agree before the first lift which signal each person can use and who may press STOP.

### How long does an OperatorLink jobsite link stay active?

A jobsite link stops working 12 hours after the first person joins it. [^1] A jobsite with nobody in it is wiped after 3 idle hours. [^1] For a new shift or a new day, start a new session and share its link or QR code with the crew. [^1]

### Do STOP signals buzz on every phone in OperatorLink?

On Android browsers, signals such as STOP make the phone buzz. [^1] iPhone Safari ignores the buzz, so on an iPhone the alert needs to be seen on screen. Check the sound and screen settings on every phone before the assembly starts, so no one misses a stop call during the lift.

### Can the assist crane crew talk by voice in OperatorLink?

Anyone who joins the jobsite can take part in a voice call run from the phone browser. [^1] One-tap radio-style calls such as Go Ahead, Copy That and All Clear are sent as chat messages. [^1] Keep a radio or hand signal ready as a fallback for the lift, since the crew should not depend on one phone alone.

OperatorLink is currently free to use, and no paid plan is built yet. [^1] - [Visit OperatorLink](/go/start)

## Sources

[^1]: OperatorLink's own description of itself (the product of this site's publisher) (/go/start)
