---
{"title": "How to coordinate block lifts with a crane cab", "description": "Coordinate block lifts with the crane cab for shipyard riggers: what to have ready, the steps in order, tool options, and common mistakes to avoid.", "url": "https://2dig.com/how-to-coordinate-block-lifts-with-the-crane-cab-for-shipyard-riggers/", "date": "2026-10-21"}
---
Coordinate block lifts with the crane cab for shipyard riggers: what to have ready, the steps in order, tool options, and common mistakes to avoid.

Block lifts are easier to control when one signal person and the crane cab agree on the signals before the load leaves the ground. For a crew that uses phones, OperatorLink shows STOP, HOLD and SLOW to the jobsite crew in a phone browser. [^1]

| Option | What it does | Fee | Card fee |
|---|---|---|---|
| OperatorLink | Shows STOP, HOLD and SLOW to the crew and passes button presses, chat and voice between phones in a browser [^1] | Currently free to use, no paid plan built yet [^1] | not published |
| Phone video call app | not published | not published | not published |
| Two-way radio | not published | not published | not published |

## What you need before you start

Shipyard riggers coordinating a block lift need the lift plan in hand, a clear view of the load, the rigging points and the landing spot before anyone moves. Name one signal person who has the block in view and gives the signals to the crane cab, and make sure every rigger knows who that person is. Agree on the signal set before the lift, including STOP, HOLD and SLOW, and what each one tells the cab. Check that every rigger can hear and see the signals from where they stand, because noise and position both affect what gets noticed. If the crew passes signals between phones, each phone needs a working browser and a data signal for the whole shift. [^1] The person who starts the jobsite shares a link or QR code, and each rigger joins from it. [^1]

## Step by step

1. Walk through the lift plan with the crane cab and every rigger before the block leaves the ground, including the route and the landing spot.
2. Confirm the signal person can see both the block and the cab, and name a backup signal person if they cannot.
3. Agree the signal set, with STOP, HOLD and SLOW included, and say what each one means to the cab.
4. Test each signal once with the load still on the ground, and get a reply from the cab.
5. Get a confirmation from every rigger that they can see and hear the signals.
6. Lift slowly to the first stage, pausing at each stage to check the load and the route.
7. If anyone sees a problem, press STOP at once and do not move until the signal person gives the next signal. If the crew uses OperatorLink, STOP releases every held direction on every phone and shows a full-screen alert to everyone else. [^1]
8. Land the block, then confirm the all-clear before anyone goes under the load.
9. At the end of the shift, agree who leaves the jobsite last. HOLD and SLOW stay on for everyone until the last person leaves. [^1]

## Tools that can do it

OperatorLink is made by the team that publishes this site. It shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser. [^1] Nobody needs to install an app, because the page runs in a browser. [^1] Holding a move button keeps sending that move to the other phones, and if it stops arriving for 2 seconds, they drop it. [^1] One-tap calls such as Go Ahead, Copy That and All Clear are sent as chat messages. [^1] Anyone who joins can take part in a voice call run from the phone browser. [^1]

A phone video call app is a second option. No facts here describe one, so check whether the crew can keep the call open for the whole shift, whether the signal person's hands stay in view, and whether the phone locks its screen during the lift.

A two-way radio is a third option. No facts here describe one, so check that the crew agrees on plain voice calls, that every rigger can be heard over machine noise, and that the channel stays clear through the lift.

Match the option to the crew and the site, and keep a fallback ready, since signals in a browser depend on the phone's data signal. [^1]

## Common mistakes to avoid

Letting the cab act on a signal that no rigger has confirmed is a common gap, so make the confirmation part of each step. Relying on one phone to carry the STOP signal is a risk, because if that phone loses its data signal, the rest of the crew does not see it, so keep a voice or hand signal ready. Assuming every phone alerts the same way is another gap. On Android browsers, signals such as STOP make the phone buzz, while iPhone Safari ignores the buzz, so check the sound and screen on every device before the lift. [^1] Reusing an old link from a previous shift is also a mistake. A jobsite link stops working 12 hours after the first person joins it. [^1] A jobsite with nobody in it is wiped after 3 idle hours, so a session left empty overnight will not be there in the morning. [^1] Finally, forgetting who leaves last can leave HOLD or SLOW on longer than planned. [^1]

## Frequently asked questions

### Is OperatorLink free to use?

OperatorLink is currently free to use, and no paid plan is built yet. [^1] It runs in a phone browser, so there is no app to install first. [^1] The phone still needs a working data signal for the whole shift, so check the phone's data plan with the crew before relying on it, and keep a backup way to pass signals ready for the lift.

### What does the STOP signal do in OperatorLink?

STOP releases every held direction on every phone and shows a full-screen alert to everyone else. [^1] HOLD and SLOW work differently, because they stay on for everyone until the last person leaves the jobsite. [^1] Any rigger who sees a problem should press STOP first, and then check with the signal person before the lift continues.

### How long does an OperatorLink jobsite link stay active?

A jobsite link stops working 12 hours after the first person joins it. [^1] A jobsite with nobody in it is wiped after 3 idle hours. [^1] For a new shift, the person who starts the session should open a fresh jobsite and share the new link or QR code with the crew. [^1]

### Does OperatorLink buzz on every phone?

On Android browsers, signals such as STOP make the phone buzz. [^1] iPhone Safari ignores the buzz, so an iPhone user may only see the alert on the screen, and the signal person should confirm that the alert was seen. The crew should test the sound and screen settings on every phone before the lift begins, so nobody misses a STOP.

### Can OperatorLink carry voice and chat during a lift?

Button presses, chat and voice pass between phones in a phone browser. [^1] Anyone who joins the jobsite can take part in a voice call run from the phone browser. [^1] One-tap calls such as Go Ahead, Copy That and All Clear are sent as chat messages. [^1] Because it runs in a browser, keep a backup such as a hand signal or radio ready.

OperatorLink is currently free to use, and no paid plan is built yet. [^1] - [Visit OperatorLink](/go/start)

## Sources

[^1]: OperatorLink's own description of itself (the product of this site's publisher) (/go/start)
