---
{"title": "How to check that crews can hear lift calls", "description": "Steps for lifting equipment inspectors to check crew members can hear lift calls before a lift, and the tools that can help.", "url": "https://2dig.com/how-to-check-that-crews-can-hear-lift-calls-for-lifting-equipment-inspectors/", "date": "2026-11-14"}
---
Steps for lifting equipment inspectors to check crew members can hear lift calls before a lift, and the tools that can help.

Run the calls from the lift plan from the spot where each crew member will stand, with the machinery running, and have every person repeat each call back. OperatorLink, one option covered below, passes button presses, chat and voice between phones in a phone browser. [^1]

| Option | What it does | Fee |
|---|---|---|
| OperatorLink | Shows STOP, HOLD and SLOW to the crew and passes button presses, chat and voice between phones in a phone browser. [^1] | Currently free to use, no paid plan built yet. [^1] |
| Phone video call app | not published | not published |
| Two-way radio | not published | not published |

## What you need before you start

Before the check, the lifting equipment inspector needs the lift plan in hand, with every call the signal person will make during the lift written down, such as the call to start a move, the call to slow down, and the call to stop. Get the names of the crew members who will be in the lift area, and note where each person will stand, because the test has to happen from those spots rather than from the office or the cab.

Each crew member needs a working phone or radio for the check. A phone also needs a working data signal, so confirm the signal in the places people will actually stand. Pick a time when the machinery will be running, since engine and hoist noise is exactly what the check is meant to test.

If the crew uses a phone-based check, the person who starts the jobsite shares a link or QR code, and each crew member joins from it. [^1] A jobsite link stops working 12 hours after the first person joins it, so start the session on the day of the check. [^1]

## Step by step

1. Gather the crew at the spot where the lift will start, and confirm each person can hear the check and can see the signal person.
2. Choose one spot for the signal person and one for the crane operator's view of the load, then test each call from both spots.
3. Run the calls from the lift plan in order, starting with the call to stop, because the stop call is the one nobody can afford to miss.
4. Ask each crew member to repeat each call back in their own words, and note the name of anyone who misses one.
5. Run the test with the machinery at the same level it will be during the lift, since engine and hoist noise change what people can hear.
6. Move each crew member to the spot where they will stand during the lift, and repeat the stop call from there.
7. Where someone misses a call, fix it before the lift: move them, change how the call is given, or add a visual signal that the crew has agreed on.
8. Write down the date, the names of the crew who passed, and any changes made, and repeat the whole check when the crew or the spots change.

## Tools that can do it

OperatorLink is made by the team that publishes this site. It shows STOP, HOLD and SLOW to the jobsite crew and passes button presses, chat and voice between phones in a phone browser. [^1] Nobody needs to install an app, because it runs in a phone browser with no app install. [^1] Anyone who joins can take part in a voice call run from the phone browser, so every crew member can be checked on the same call. [^1] One-tap radio-style calls such as Go Ahead, Copy That and All Clear are sent as chat messages. [^1]

A phone needs a working data signal for any phone-based check, so keep a fallback ready.

A phone video call app is a second option. No facts here describe one, so check whether the crew can keep the call open for the whole shift, whether the signal person's hands stay in view, and whether the phone locks its screen mid-lift.

A two-way radio is a third option. No facts here describe one, so check that the crew agrees on plain voice, that every member can be heard over machine noise, and that the channel stays clear through the lift.

Match the option to the crew and the site, and test the one you choose from the spots where people will stand.

## Common mistakes to avoid

Testing in a quiet spot and assuming the crew will hear the same calls over running machinery is a common error. Testing with the signal person standing beside the inspector, instead of at the spot where the crew will work, gives a result that does not match the lift. Skipping the stop call during the test is another mistake, and it is the call that matters most. Counting a call as heard because nobody spoke up is risky, so ask each person to repeat it back.

Using a session link from an earlier shift can fail, because a jobsite link stops working 12 hours after the first person joins it. [^1] Starting a session early and leaving it empty can also cost time, since a jobsite with nobody in it is wiped after 3 idle hours. [^1]

Assuming every phone alerts the same way is another mistake. On Android browsers, signals such as STOP make the phone buzz, while iPhone Safari ignores the buzz, so check the screen as well as the sound on every phone. [^1] Sharing the link beyond the crew named on the plan is the last mistake to avoid.

## Frequently asked questions

### Is OperatorLink free to use?

OperatorLink is currently free to use, and no paid plan is built yet. [^1] Any phone-based check needs a working data signal, so check each phone's signal in the spots where the crew will stand before the check begins. Keep a radio or hand signal ready as a fallback in case a phone drops out during the lift.

### Can OperatorLink carry voice calls to the whole crew?

Anyone who joins the session can take part in a voice call run from the phone browser. [^1] The check should confirm that every crew member can hear the call from the spot where they will stand, because a call that reaches a phone may still be hard to hear over machine noise. Ask each person to repeat the call back so the result is written down.

### Does OperatorLink buzz the phone when STOP is sent?

On Android browsers, signals such as STOP make the phone buzz, and iPhone Safari ignores the buzz. [^1] On an iPhone, the alert may be seen only on the screen, so the check should include a screen check as well. [^1] Confirm before the lift that every phone shows the alert and that each person notices it.

### How long does an OperatorLink jobsite link stay active?

A jobsite link stops working 12 hours after the first person joins it. [^1] A jobsite with nobody in it is wiped after 3 idle hours. [^1] Start the session on the day of the check, and share a fresh link with the crew if the check runs on another day or the crew changes.

### What happens when STOP is pressed in OperatorLink?

STOP releases every held direction on every phone and shows a full-screen alert to everyone else. [^1] HOLD and SLOW stay on for everyone until the last person leaves the jobsite. [^1] Agree on how each signal is cleared before the lift, and include the stop call in the check.

OperatorLink is currently free to use, and no paid plan is built yet. [^1] - [Visit OperatorLink](/go/start)

## Sources

[^1]: OperatorLink's own description of itself (the product of this site's publisher) (/go/start)
